better stats nz
Government / Agencies / Ministry of Housing and Urban Development

Ministry of Housing and Urban Development

Leads housing and urban development policy and funds public and transitional housing.

Department · one of 17 policy ministries

282full-time equivalent staff, June 2026, −1.6% on a year earlier
$65mits own running costs in 2024/25, and $6,833m of benefits, grants and other payments it administers
$4.6mon contractors and consultants in 2025/26 ($4.1m the year before)
99%of information requests answered on time in the last year

In brief

The Ministry of Housing and Urban Development has 282 full-time equivalent staff, 7% fewer than five years ago.

In 2024/25 it spent $65 million on its own work and passed on $6.8 billion, most of it as investment in other public bodies.

Its largest group of staff is policy analysts, 28% of the total, then clerical and administrative workers (21%).

What it does, in more detail

What's unusual

  • Against its promisesIt dropped 15 of the 87 performance measures it had a year earlier in Budget 2025, and added 2.

Chosen by rule, not by hand: a result against what it forecast, a figure at its highest or lowest in at least eight years, or one at either end of the policy ministries. Unusual isn't the same as wrong; it's where to look first.

Six questions, the same for every agency

Each is answered with a figure from the best evidence this site has, and what that figure rests on. This site doesn't rate agencies: they set their own standards, outcomes have many causes, and budgets are not always plans. Where there is no evidence, it says so.

How are things going in its area?

DPMC: on track

It leads the Government's target for fewer households in emergency housing (which DPMC rates on track). Median weekly rent, new tenancies: $599 in Sep 2026, about the same as a year earlier.

What this rests onGovernment targets: the Department of the Prime Minister and Cabinet's own rating each quarter. Outcomes: official statistics; many things besides the agency move them, so read them as the state of its area, not a score for it.

How many of its own standards does it meet?

Not yet checked (no evidence here)

Budget 2025 lists 74 performance measures for it. In May it expected to miss none of the 41 that can be scored. The audited results are in its annual report, which this site hasn't read yet, so its own forecast is all there is.

What this rests onThe agency's own standards, set in the Estimates and audited in its annual report. They show whether it did what it said it would, not whether it promised the right things, and can't be compared between agencies.

How much of its capital budget does it spend?

47% of budget spent

Over 2021/22 to 2023/24 it spent $5.5 million on capital, against $12 million in the Budgets at the start of those years and $6.5 million in the estimates made late in each year.

What this rests onCapital spending (buildings, IT, equipment) against the figure in the Budget at the start of each year, over the last three years. Read it with care: departments' capital is spent under a standing authority, not a limit; the Budget-day figure is often a round or repeated amount rather than a plan; and money is routinely moved between years as projects are rescheduled. A low share can mean late projects, rescheduling or savings; a high one, money added during the year. Source: Treasury.

How close is its spending to its budget?

6% over budget

It spent $65 million running itself in 2024/25, 6% more than the figure set on Budget day. The Ministry of Housing and Urban Development's running costs went from $46 million in 2018/19 to $65 million in 2024/25, up 40% (up 12% after inflation), while its staff numbers grew 18%.

What this rests onIts own running costs (staff, buildings, IT, contractors) against the figure set on Budget day, from Treasury's appropriations data. Parliament can add money during the year, so ending above the Budget-day figure is not overspending; it shows how well that figure predicted the cost.

How quickly does it answer information requests?

99% on time

It answered 237 information requests in the last year, 99% within the legal time limit (similar agencies' median: 100%). For every 1,000 requests, 14.0 ended with a complaint to the Ombudsman that the agency put right (similar agencies' median: 12.2).

What this rests onRequests under the Official Information Act, from the Public Service Commission's statistics, and complaints about them to the Ombudsman: the one service every agency provides and reports the same way. It says little about an agency's main work.

How many of its staff are leaving?

17% left by choice

17% of its staff left by choice in 2025/26, against 21% a year on average over the 5 years before (similar agencies' median: 16.9%). Staff numbers fell 2% in the year. 6 people were made redundant.

What this rests onThe Public Service Commission's workforce data, counted the same way for every department. High turnover can mean a troubled workplace or a strong job market for its skills; restructuring shows up in staff numbers and redundancies.
A figureNo evidence here

What it does

Parliament votes money to the Ministry of Housing and Urban Development line by line, and each line says what it is for. That is the plainest account of its work, alongside the jobs its staff do.

Where the money went, 2024/25

Investment in other public bodies$3,969m58%
Services it pays others to deliver$2,609m38%
Grants, subsidies and other payments$244m4%
Its own work$64.9m<1%
Benefits and other payments to people$11.2m<1%

$6,898m through 48 appropriations in Vote Housing and Urban Development. “Its own work” is what the agency controls; the rest it passes on, and follows demand and policy. Source: Treasury.

What its staff do

Share of staff by occupation, June 2026 (public service share in brackets)

Policy analysts (6%)28%
Clerical and administrative workers (8%)21%
Information professionals (15%)20%
Managers (12%)17%
Legal, HR and finance professionals (5%)7%
Inspectors and regulatory officers (20%)4%
ICT professionals and technicians (4%)3%
Other professionals (4%)1%

Its largest lines of spending

  • Kāinga Ora – Homes and Communities Private Debt Refinancing Facility$1,925mLoans to Kainga Ora – Homes and Communities (and any of its subsidiaries) for the purpose of refinancing private debt.
  • Purchase of Public Housing Provision$1,844mPurchasing the provision of public housing and related services from public housing providers.
  • Kāinga Ora – Homes and Communities Crown Lending Facility$1,450mLoans to Kainga Ora - Homes and Communities (and any of its subsidiaries).
  • Investment in Crown-owned Entities to Advance Development-Ready Land$267mInvestments in Crown-owned entities to increase the amount of development-ready land.
  • Provision of Transitional Housing Places$180mSupporting transitional housing providers to provide transitional housing places.
  • Transitional Housing Services$174mPayments to transitional housing providers to cover tenancy and property management, and services to support tenants in transitional housing to move into sustainable housing.

The 6 largest of 48, with Parliament's description of what each may be spent on. Every appropriation.

How things are going in its area

The results the Ministry of Housing and Urban Development works towards. Many things besides the agency move them, so read these as the state of its area rather than a score for the agency alone.

Government target it leads

TargetAimFirst reportLatestDPMC's assessment, each quarter
8. Fewer households in emergency housing
75% fewer households in emergency housing (under 800)
under 800 2,133
Jun 2024
459
Jun 2026 report
On track
On track Probable Feasible At risk Unachievable

Status and latest result from DPMC's quarterly reports on the Government's nine targets for 2030. All nine targets.

Official statistics in its area

The latest figure for each, the change on a year earlier and the last eight or so years. Survey figures count as changed only when the difference is outside the survey's margin of error.

Median weekly rent, new tenancies $599 Sep 2026 About the same as a year earlier ($590) MBIE, tenancy bond data · More on this

What it promised, and what happened

Each Budget sets the standards the Ministry of Housing and Urban Development is funded to meet and the money it may spend. These are its own standards, so they show whether it does what it said it would, not whether those were the right things to promise.

Budget 2025 set 74 performance measures for the Ministry of Housing and Urban Development. Over the last three Budgets it dropped 41 and added 15, and lowered 1 standard. When that Budget came out, it expected to have met 41 of the 41 standards it could be judged on for the year then ending, and to have missed none. Whether it actually met them is in its annual report, which this site hasn't read yet, so the forecast can't be checked.

Why it matters. These standards are what Parliament funds the agency to deliver. Agencies set them and report against them themselves, so watch for standards dropped or lowered, and for forecasts of success the annual report doesn't bear out.

Its standards, Budget by Budget

Expected to meet or miss: its estimated result for the year then ending against that year's standard, where both can be read as figures; the rest are worded standards, ranges or new measures. Dropped: marked removed in the Estimates, or with no close match in the next Budget.

BudgetMeasuresNewDroppedExpected to meetExpected to missLoweredRaised
20257421541001
202487111437112
20238221238201
20225822732001
202175131322001
2020404724001
2019280–14000

Measures dropped in Budget 2025

MeasureLast standardExpected resultHow
Number of Signed KiwiBuild Developers Agreements
Buying off the Plans Programme
50Measure deleted
Percentage of households with children in Rotorua Temporary
Contracted emergency housing accommodation and services
90%75%Measure deleted
Average number of days taken to assess a completed Buy off the Plans eligibility application
Kāinga Ora - Homes and Communities
less than 5 working days2 working daysMeasure deleted
Number of new applications assessed for eligibility for First
Kāinga Ora - Homes and Communities
Demand driven up to72Measure deleted
Payments are made in accordance with the terms of the agreement for notified claims
Tāmaki Regeneration Company Limited - Equity Injection
AchievedAchievedMeasure deleted
The number of homes contracted through the Affordable Rental Pathway
Upfront Payments
161161Deleted
Pathway
Affordable Housing Fund
Payments MCAPayments MCANo longer listed
The number of homes unlocked through the Build Ready Development Pathway
Affordable Housing Fund
18591No longer listed
The regulatory functions, systems and processes necessary to give effect to the legislation are established by the date(s) that relevant sections of legislation and regulations commence
Authority for the Residential Property Management Regime
AchievedAchievedNo longer listed
The regulatory functions, systems and processes are established in accordance with the requirements of the regulatory regime
Authority for the Residential Property Management Regime
AchievedAchievedNo longer listed
Case studies are completed that demonstrate innovative solutions or lessons to reduce or prevent homelessness
Local Innovations and Partnerships
AchievedAchievedNo longer listed
Number of capability buildings projects enabled
Progressing the Pipeline of Māori Housing 2022 - 2025
1521No longer listed
Number of homes contracted
Support Services to increase home ownership
Refer to PHO Fund appropriationRefer to PHO Fund appropriationNo longer listed
Percentage of grants paid on settlement day for an approved grant application
First Home Grants
New measureNew measureNo longer listed
Prepayment of grants for the Progressive Home Ownership Fund contribute to assisting access to home ownership
Upfront Payments
AchievedAchievedNo longer listed

Source: Treasury, Estimates of Appropriations, Budgets 2019–2025.

Capital: budgeted and spent

The Ministry of Housing and Urban Development spent less on capital than it budgeted in 3 of the last 4 years, 51% of budget overall. That can mean projects ran late, were rescheduled into later years, or cost less than expected.

Why it matters. Capital pays for buildings, IT and equipment. The Budget figure is often a standing amount rather than a plan, so a gap is a reason to ask what happened to the projects, not an answer in itself.

YearBudgetLate estimateSpent
2023/24$6.8m$4.3m$1.3m
2022/23$2.5m$1.2m$3.4m
2021/22$2.5m$1.0m$0.8m
2020/21$5.1m$5.1m$3.1m
2019/20$0.4m$1.0m$2.2m
2018/19$0.0m$1.0m$0.9m

Its own capital spending (buildings, IT, equipment). Budget: set before the year, and often a round or repeated figure rather than a plan; the late estimate is revised near the end, often to what will be spent. Departments' capital is spent under a standing authority, not a limit, and money moves between years as projects are rescheduled.

Its own running costs

The Ministry of Housing and Urban Development's running costs went from $46 million in 2018/19 to $65 million in 2024/25, up 40% (up 12% after inflation), while its staff numbers grew 18%. Its spending has differed from the late estimate by as much as 14% in a year.

Why it matters. Running costs (staff, buildings, IT, contractors) are what the agency controls itself. Growth well ahead of inflation and of staff numbers means each person costs more to support; regular top-ups mean the Budget figure understates what it really costs.

YearBudgetLate estimateSpent
2024/25$61m$68m$65m
2023/24$73m$79m$75m
2022/23$72m$82m$78m
2021/22$72m$72m$74m
2020/21$64m$67m$62m
2019/20$64m$71m$62m
2018/19$0m$48m$46m

Staff, buildings, IT and contractors: the money it spends running itself, as against the benefits, grants and other payments it administers, which follow demand and policy.

Serving the public

Requests for information

In Jan–Jun 2026 the Ministry of Housing and Urban Development completed 101 requests under the Official Information Act, 98% within the legal time limit (usually 20 working days). 25% had their deadline extended. It published 55 of its responses.

Requests and timeliness: the Public Service Commission's six-monthly OIA statistics, which every agency reports the same way. Complaints: the Ombudsman's own six-monthly data, counted the same way for every agency.

Share answered on time

% of requests completed within the legal time limit, each half-year

Half-yearRequestsOn timeExtendedAverage working days
Jan–Jun 202610198%25%18.5
Jul–Dec 2025136100%14%15.4
Jan–Jun 2025121100%11%12.6
Jul–Dec 202414399%13%16.1
Jan–Jun 2024111100%6%14.2
Jul–Dec 202367100%15%15.6

Complaints to the Ombudsman

About its handling of information requests. Remedied: the agency changed its decision, released information or apologised. Upheld: the Ombudsman found it had got it wrong. How the Ombudsman records findings has changed over time, so compare remedied cases more than upheld ones. Over the last two years: 14.0 complaints remedied for every 1,000 requests it completed.

Half-yearReceivedCompletedRemediedUpheld
Jan–Jun 20262440
Jul–Dec 20253110
Jan–Jun 20251300
Jul–Dec 20240520
Jan–Jun 202450––
Jul–Dec 20231310

Compared with agencies like it

The Ministry of Housing and Urban Development is compared with the policy ministries. Ministries that mainly advise ministers and fund or oversee other organisations' work, rather than deliver services themselves.

The others: Department of the Prime Minister and Cabinet, Ministry for Culture and Heritage, Ministry for Ethnic Communities, Ministry for Pacific Peoples, Ministry for Regulation, Ministry for Women, Ministry for the Environment, Ministry of Defence, Ministry of Disabled People – Whaikaha, Ministry of Foreign Affairs and Trade, Ministry of Health, Ministry of Transport, Public Service Commission, Social Investment Agency, Te Puni Kōkiri, The Treasury.

MeasureMinistry of Housing and Urban DevelopmentSimilar agencies' medianLowest to highest, all agenciesAmong similar agencies
Delivery
Capital spent, % of what it budgeted (3 years)47%47%
4th of 7
Information requests answered on time99%100%
11th of 17
Ombudsman complaints remedied, per 1,000 requests14.012.2
5th of 12
Size, people and costs
Staff (FTE)282195
7th of 17
Staff, change on a year earlier−1.6%+1.6%
10th of 17
Average salary$142k$141k
8th of 17
Gender pay gap7.2%7.7%
11th of 16
Staff leaving by choice17.1%16.9%
8th of 17
Contractors, share of running costs6.3%5.7%
6th of 16
Running costs per FTE$226k$236k
10th of 16
Ministry of Housing and Urban DevelopmentSimilar agenciesTheir median

Only measures every agency reports the same way. Places count from the highest; where fewer than six similar agencies have a figure, no place is given. A place is not a grade: for most of these (pay, staff leaving, contractors, cost per person) neither end is simply better. Capital: last three years with a capital budget of $1m or more (Treasury). Information requests: share on time over the last year (Public Service Commission). Ombudsman: complaints remedied over the last two years per 1,000 requests completed. Staff, pay and turnover: Public Service Commission (departments only for pay). Running costs and contractors' share: Treasury and PSC, latest year.

People and money

Staff

Full-time equivalents, June each year

Average salary and gender pay gap

June each year

Ministry of Housing and Urban DevelopmentPublic service

The workforce

June 2026, with the whole public service beside it where the Commission publishes the figure.

Ministry of Housing and Urban DevelopmentPublic service
Women48.1%61.2%
Women in senior management46.2%57.6%
Māori22.1%16.5%
Pacific peoples3.2%11.5%
Asian10.4%17.0%
On fixed-term contracts7.3%4.6%
Left by choice in the year17.1%10.8%
Redundancies in the year6–
Average age43.6 years44.7 years
Average years with the agency4.9 years8.4 years
Sick and domestic leave taken8.8 days10.4 days

The money it manages

In 2024/25 the Ministry of Housing and Urban Development spent $6,898m through the appropriations it administers, $65m of it on running itself.

Spending through the vote it administers, 2024/25, including benefits, grants and funding for other bodies.

Appropriation by appropriation, 2024/25

AppropriationBudgetSpent
Kāinga Ora – Homes and Communities Private Debt Refinancing Facility (Vote Housing and Urban Development)$1,925.0m$1,925.0m
Purchase of Public Housing Provision (Vote Housing and Urban Development)$1,933.8m$1,844.2m
Kāinga Ora – Homes and Communities Crown Lending Facility (Vote Housing and Urban Development)$2,352.0m$1,450.0m
Investment in Crown-owned Entities to Advance Development-Ready Land (Vote Housing and Urban Development)$649.0m$266.9m
Provision of Transitional Housing Places (Vote Housing and Urban Development)$208.5m$180.5m
Transitional Housing Services (Vote Housing and Urban Development)$228.4m$173.7m
Investment in Infrastructure to Advance Development-Ready Land (Vote Housing and Urban Development)$330.6m$157.1m
Services for People in Need of or at risk of Needing Public Housing (Vote Housing and Urban Development)$95.8m$106.2m
Tāmaki Regeneration Company Limited - Equity Injection (Vote Housing and Urban Development)$98.0m$98.0m
He Kūkū ki te Kāinga - Increasing Māori Housing Supply - prepayment of upfront funds (Vote Housing and Urban Development)$194.5m$63.5m
Infrastructure Investment to Progress Urban Development (Vote Housing and Urban Development)$62.4m$57.9m
Buying off the Plans Programme (Vote Housing and Urban Development)$28.4m$55.8m
Progressive Home Ownership Fund (Vote Housing and Urban Development)$96.0m$52.0m
Kāinga Ora - Homes and Communities (Vote Housing and Urban Development)$56.4m$49.7m
Affordable Housing Fund - Prepayment of Grants (Vote Housing and Urban Development)$50.0m$49.4m
Affordable Housing Fund (Vote Housing and Urban Development)$35.2m$40.8m
Policy Advice and Ministerial Servicing (running costs, Vote Housing and Urban Development)$33.5m$32.6m
He Kūkū ki te Kāinga – Increasing Māori Housing Supply (Vote Housing and Urban Development)$11.0m$30.2m
Housing Infrastructure Fund Loans (Vote Housing and Urban Development)$114.0m$29.1m
Management of Housing Provision and Services (running costs, Vote Housing and Urban Development)$20.7m$26.8m
Contracted emergency housing accommodation and services (Vote Housing and Urban Development)$27.8m$25.3m
Land for Housing Operations (Vote Housing and Urban Development)$8.4m$23.1m
Community Group Housing Market Rent Top-Up (Vote Housing and Urban Development)$21.6m$21.6m
Sale of Developments Underwritten - Costs (Vote Housing and Urban Development)$43.0m$21.2m
Amortisation of Upfront Payments - He Kūkū ki te Kāinga (Vote Housing and Urban Development)$27.7m$20.8m
Māori Infrastructure Projects - Prepayment of Upfront Funds (Vote Housing and Urban Development)$43.2m$15.8m
First Home Grants (Vote Housing and Urban Development)$35.0m$11.2m
Community Housing Providers - Early Stage Operating Supplement (Vote Housing and Urban Development)$25.0m$9.6m
Land for Housing Programme (Vote Housing and Urban Development)$280.5m$7.9m
Sale of Land and Dwellings – Costs (Vote Housing and Urban Development)$24.0m$7.1m
Local Innovations and Partnerships (Vote Housing and Urban Development)$6.2m$5.6m
Facilitating the Purchase and redevelopment of land for housing purposes (running costs, Vote Housing and Urban Development)$6.8m$5.5m
Land purchase within the Housing Agency Account (Vote Housing and Urban Development)–$5.1m
Kāinga Ora Land Programme (Vote Housing and Urban Development)$9.8m$4.6m
Acquisition and Improvement of Community Group Housing Properties (Vote Housing and Urban Development)$5.8m$4.5m
Operating the Land for Housing Programme (Vote Housing and Urban Development)$4.2m$4.5m
Amortisation of Upfront Payments - Social Housing Upfront Capital Payments (Vote Housing and Urban Development)$4.1m$4.1m
Community Housing Rent Relief (Vote Housing and Urban Development)$4.1m$3.3m
Amortisation of Upfront Payments - Affordable Housing Fund (Vote Housing and Urban Development)$6.9m$1.8m
Progressing the Pipeline of Māori Housing 2022 - 2025 (Vote Housing and Urban Development)$6.8m$1.6m
Operating the Buying off the Plans Programme (Vote Housing and Urban Development)$0.1m$1.5m
Support Services to increase home ownership (Vote Housing and Urban Development)$5.0m$1.3m
Amortisation of Upfront Payments - Community Housing Providers - Early Stage Operating Supplement (Vote Housing and Urban Development)$2.2m$0.7m
Services Related to the Provision of Public Housing (Vote Housing and Urban Development)$0.3m$0.5m
Amortisation of Upfront Payments - Māori Infrastructure Fund (Vote Housing and Urban Development)$1.2m$0.3m
Housing Assistance (Vote Housing and Urban Development)$0.8m$0.1m
Land for Housing Programme - developers' loan payments (Vote Housing and Urban Development)–$0.0m
Management of Crown Properties held under the Housing Act 1955 (Vote Housing and Urban Development)$0.0m$0.0m

Contractors and consultants

$ million a year, years to June (Public Service Commission)

TotalOf which capital

About these numbers

What it does, the sentence under the agency's name, was written for this site; the spending lines and their descriptions are Parliament's. The six questions and what's unusual are worked out by fixed rules from the figures on this page, the same for every agency; they report figures and don't rate the agency. Outcomes come from the data on the site's topic pages; the agency is one influence on them among many. Standards and forecasts are from the Estimates of Appropriations and the agency's annual report: they are the agency's own standards. Capital and running costs are Treasury's appropriations data.

Staff, pay and contractors are from the Public Service Commission's workforce data, which measures every department the same way.

Sources: Public Service Commission Te Kawa Mataaho, Workforce Data and OIA statistics; Office of the Ombudsman; Treasury, Estimates of Appropriations; Department of the Prime Minister and Cabinet, Government targets; MBIE, tenancy bond data.