Ministry of Transport
Advises on transport policy and oversees the transport Crown entities, including the NZ Transport Agency.
Department · one of 17 policy ministries
In brief
The Ministry of Transport has 171 full-time equivalent staff, 8% fewer than five years ago.
In 2024/25 it spent $51 million on its own work and passed on $9.0 billion, most of it as services it pays others to deliver.
Its largest group of staff is policy analysts, 58% of the total, then managers (17%).
What's unusual
- Against its promisesIt dropped 51 of the 156 performance measures it had a year earlier in Budget 2025, and added 15.
- In its areaRoad deaths: 268 in 2025, down from 290 a year earlier.
- Against its own pastStaff down 15% in a year, to 171 FTE.
- Against other agenciesStaff leaving by choice: 31.0%, the highest of the 17 policy ministries with a figure (their median 16.9%).
Chosen by rule, not by hand: a result against what it forecast, a figure at its highest or lowest in at least eight years, or one at either end of the policy ministries. Unusual isn't the same as wrong; it's where to look first.
Six questions, the same for every agency
Each is answered with a figure from the best evidence this site has, and what that figure rests on. This site doesn't rate agencies: they set their own standards, outcomes have many causes, and budgets are not always plans. Where there is no evidence, it says so.
How are things going in its area?
Road deaths: 268 in 2025, down from 290 a year earlier.
What this rests on
Government targets: the Department of the Prime Minister and Cabinet's own rating each quarter. Outcomes: official statistics; many things besides the agency move them, so read them as the state of its area, not a score for it.How many of its own standards does it meet?
Budget 2025 lists 117 performance measures for it. In May it expected to miss 1 of the 66 that can be scored. The audited results are in its annual report, which this site hasn't read yet, so its own forecast is all there is.
What this rests on
The agency's own standards, set in the Estimates and audited in its annual report. They show whether it did what it said it would, not whether it promised the right things, and can't be compared between agencies.How much of its capital budget does it spend?
Over 2018/19 it spent $0.9 million on capital, against $2.1 million in the Budgets at the start of those years and $0.9 million in the estimates made late in each year.
What this rests on
Capital spending (buildings, IT, equipment) against the figure in the Budget at the start of each year, over the last three years. Read it with care: departments' capital is spent under a standing authority, not a limit; the Budget-day figure is often a round or repeated amount rather than a plan; and money is routinely moved between years as projects are rescheduled. A low share can mean late projects, rescheduling or savings; a high one, money added during the year. Source: Treasury.How close is its spending to its budget?
It spent $51 million running itself in 2024/25, 17% less than the figure set on Budget day. The Ministry of Transport's running costs went from $36 million in 2017/18 to $51 million in 2024/25, up 43% (up 12% after inflation), while its staff numbers grew 32%.
What this rests on
Its own running costs (staff, buildings, IT, contractors) against the figure set on Budget day, from Treasury's appropriations data. Parliament can add money during the year, so ending above the Budget-day figure is not overspending; it shows how well that figure predicted the cost.How quickly does it answer information requests?
It answered 233 information requests in the last year, 100% within the legal time limit (similar agencies' median: 100%). For every 1,000 requests, 19.8 ended with a complaint to the Ombudsman that the agency put right (similar agencies' median: 12.2).
What this rests on
Requests under the Official Information Act, from the Public Service Commission's statistics, and complaints about them to the Ombudsman: the one service every agency provides and reports the same way. It says little about an agency's main work.How many of its staff are leaving?
31% of its staff left by choice in 2025/26, against 28% a year on average over the 5 years before (similar agencies' median: 16.9%). Staff numbers fell 15% in the year. 4 people were made redundant.
What this rests on
The Public Service Commission's workforce data, counted the same way for every department. High turnover can mean a troubled workplace or a strong job market for its skills; restructuring shows up in staff numbers and redundancies.What it does
Parliament votes money to the Ministry of Transport line by line, and each line says what it is for. That is the plainest account of its work, alongside the jobs its staff do.
Where the money went, 2024/25
$9,060m through 70 appropriations in Vote Transport. “Its own work” is what the agency controls; the rest it passes on, and follows demand and policy. Source: Treasury.
What its staff do
Share of staff by occupation, June 2026 (public service share in brackets)
Its largest lines of spending
- National Land Transport Programme$3,934mThe estimated amount to be spent on activities under the National Land Transport Programme, as authorised by section 9 (3) and (4) of the Land Transport Management Act 2003.
- Government Policy Statement on Land Transport - Capital Grant (2024-2028)$1,186mProviding additional capital funding to the National Land Transport Fund to give effect to the Government Policy Statement on land transport.
- Rail - Maintenance and Renewal of the Rail Network (2024-2028)$743mExpenses incurred for the maintenance and renewal of the rail network including for the approved Rail Network Investment Programme.
- Capital Investment Package - Funding for Crown assets$739mInvestment in specified roading, walking, and cycling projects that support the announced objectives of the Capital Investment Package and that will result in assets owned by the Crown.
- Government Policy Statement on Land Transport Loan (2024 -2028)$460mA loan to NZ Transport Agency to give effect to the Government Policy Statement on land transport.
- Rail - KiwiRail Holdings Limited$378mA capital injection to KiwiRail Holdings Limited to finance approved capital expenditure on the New Zealand rail system.
The 6 largest of 70, with Parliament's description of what each may be spent on. Every appropriation.
How things are going in its area
The results the Ministry of Transport works towards. Many things besides the agency move them, so read these as the state of its area rather than a score for the agency alone.
Official statistics in its area
The latest figure for each, the change on a year earlier and the last eight or so years. Survey figures count as changed only when the difference is outside the survey's margin of error.
What it promised, and what happened
Each Budget sets the standards the Ministry of Transport is funded to meet and the money it may spend. These are its own standards, so they show whether it does what it said it would, not whether those were the right things to promise.
Budget 2025 set 117 performance measures for the Ministry of Transport. Over the last three Budgets it dropped 113 and added 40, and lowered none. When that Budget came out, it expected to have met 65 of the 66 standards it could be judged on for the year then ending, and to have missed 1. Whether it actually met them is in its annual report, which this site hasn't read yet, so the forecast can't be checked.
Why it matters. These standards are what Parliament funds the agency to deliver. Agencies set them and report against them themselves, so watch for standards dropped or lowered, and for forecasts of success the annual report doesn't bear out.
Its standards, Budget by Budget
Expected to meet or miss: its estimated result for the year then ending against that year's standard, where both can be read as figures; the rest are worded standards, ranges or new measures. Dropped: marked removed in the Estimates, or with no close match in the next Budget.
| Budget | Measures | New | Dropped | Expected to meet | Expected to miss | Lowered | Raised |
|---|---|---|---|---|---|---|---|
| 2025 | 117 | 15 | 51 | 65 | 1 | 0 | 2 |
| 2024 | 156 | 9 | 36 | 77 | 2 | 0 | 0 |
| 2023 | 171 | 16 | 26 | 75 | 1 | 0 | 0 |
| 2022 | 158 | 29 | 14 | 66 | 1 | 0 | 0 |
| 2021 | 117 | 33 | 41 | 43 | 3 | 0 | 0 |
| 2020 | 128 | 34 | 26 | 51 | 1 | 0 | 0 |
| 2019 | 124 | 29 | 28 | 55 | 0 | 0 | 0 |
| 2018 | 110 | 8 | – | 57 | 0 | 0 | 1 |
Measures dropped in Budget 2025
| Measure | Last standard | Expected result | How |
|---|---|---|---|
| Support delivered to the Airspace Integration Trials programme as agreed with the Ministry of Business, Innovation and Employment (MBIE) Civil Aviation and Maritime Security Services | 100% | 100% | Measure removed |
| Number of community provider organisations who have accessed a Community Driver Testing Officer or Driver Testing Officer for dedicated Class 1 practical tests for students (see New Zealand Transport Agency: Regulatory Services | 26 or greater | 35 | Measure removed |
| Establish investment criteria for the Coastal Shipping Resilience Fund Coastal Shipping Resilience Fund | Achieved | Achieved | Measure removed |
| Survey results show that the New Zealand Search and Rescue Council is satisfied with the provision of effective support services and policy advice for the New Zealand search and rescue sector Search and Rescue Activity Coordination PLA | 95% or higher | 100% | No longer listed |
| Delivery of the National Search and Rescue Support Programme including the provision of governance, leadership, and strategic support for the Search and Rescue sector Search and Rescue Activity Coordination PLA | 90% | 90% | No longer listed |
| Research determining recommendations for the best long-term institutional arrangements to support EV charging is completed Milford Sound/Piopiotahi Aerodrome Search and Rescue Training and Training Coordination | 100% | No longer a measure | No longer listed |
| The Milford Sound/Piopiotahi aerodrome operation will conform with appropriate Civil Aviation Authority safety requirements Search and Rescue Training and Training Coordination | Achieved | Achieved | No longer listed |
| The operating costs for the Milford Sound/Piopiotahi aerodrome are within third-party revenue Fuel Excise Duty Refund Administration Search and Rescue Training and Training Coordination | Achieved | Not Achieved | No longer listed |
| Average number of days taken to process refunds of fuel excise duty Search and Rescue Training and Training Coordination | 20 working days or less | 5.5 working days 20 working days or less | No longer listed |
| Milestones are completed in line with the programme developed and maintained by ALR Ltd as required through the Project Planning and Funding Agreement dated 6 October 2022 Auckland Light Rail - Detailed Planning Phase | 100% | 100% | No longer listed |
| Disposal of the property at 317 New North Road and disestablishment of the company Auckland Light Rail - Detailed Planning Phase | New measure | New measure | No longer listed |
| We will ensure New Zealand’s obligations as a signatory State to the Chicago convention are met, where appropriate for – New Zealand, through, Maintained alignment with existing Standards and Recommended Practices (SARPs) Civil Aviation and Maritime Security Services | Maintained | Maintained | No longer listed |
| We will ensure New Zealand’s obligations as a signatory State to the Chicago convention are met, where appropriate for – New Zealand, through, “Filling of Differences” completed within required timeframes for new SARPS that are the responsibility of the Civil Aviation Authority Civil Aviation and Maritime Security Services | 100% | 100% | No longer listed |
| Reports, correspondence and Parliamentary questions acceptable to the Minister (assessed by biannual survey) based on a scale of “exceeded expectations”, “met expectations” or “requires improvement” Civil Aviation and Maritime Security Services | Meet or exceed expectations | Met expectations | No longer listed |
| The policy advice we provide to Ministers, government departments and agencies will meet the CAA’s internal guidelines for quality policy advice Civil Aviation and Maritime Security Services | 100% | 100% | No longer listed |
| Maintain appropriate capability for core functions - appropriate resourcing to meet service level requirements Civil Aviation Authority - Core Functions | New measure | New measure | No longer listed |
| We include aviation-specific Health and Safety guidance in safety and security guidance material published by the Authority We will complete health and safety assessments, investigations and audits within Health and Safety at Work Activities - Civil Aviation | 8-12 | 8 | No longer listed |
| 180 days Health and Safety at Work Activities - Civil Aviation | 70% | 70% | No longer listed |
| 12 months Health and Safety at Work Activities - Civil Aviation | 100% | 100% | No longer listed |
| Number of testing days that community provider organisations have booked for Class 1 practical dedicated student bookings Land Transport Regulatory Services | 600 or greater | 600 | No longer listed |
| Number of advisors supporting community driver training, education and testing Land Transport Regulatory Services | 11 or greater | 11 | No longer listed |
| The number of Maritime Incident Response Team (MIRT) exercises and workshops completed annually Maritime Regulatory and Response Services | 12 | 6 | No longer listed |
| The number of recreational craft information and education campaigns delivered Maritime Regulatory and Response Services | 3-5 | 3-5 | No longer listed |
| The percentage of recreational craft surveys undertaken that meet Maritime NZ’s quality criteria Maritime Regulatory and Response Services | 100% | 100% | No longer listed |
| The percentage of allocated recreational craft investment funding paid out to key target areas. Maritime Regulatory and Response Services | 95% or greater | 95% or greater | No longer listed |
| Proportion of local road improvement activities funded by the National Land Transport Programme PLA | 80% or greater | Not available | No longer listed |
| Proportion of state highway improvement activities funded by the National Land Transport Programme Capital PLA | 80% or greater | Not available | No longer listed |
| National Land Transport Fund delivered to agreed standards and timeframes National Land Transport Programme Capital PLA | – | (see Note 2) | No longer listed |
| Punctuality of metro rail services National Land Transport Programme PLA | 95% or greater | Not available (see Note 2) | No longer listed |
| Proportion of cycleways, pathways and shared paths delivered against what was funded National Land Transport Programme PLA | Baseline reset | Not available (see Note 2) | No longer listed |
| Freight travel time reliability National Land Transport Programme PLA | 90% or greater | 90% | No longer listed |
| Amount of freight carried by rail National Land Transport Programme PLA | 4,050 Net tonne kms of 4,050 Net tonne kms of 4,170 Net tonne kms of | freight carried by rail freight carried by rail freight carried by rail | No longer listed |
| Provision of appropriate Search and Rescue services to Coordination Authorities on request Search and Rescue and Recreational Boating Safety Activities PLA | 100% | 99% | No longer listed |
| Provision of agreed New Zealand avalanche hazard advisory services Search and Rescue and Recreational Boating Safety Activities PLA | 100% | 100% | No longer listed |
| Payments are made within 30 days of City Rail Link Limited receiving a completed application Auckland City Rail Link Targeted Hardship Fund | 100% | 100% | No longer listed |
| Milestones are completed in line with the programme developed and maintained by Auckland Light Rail Ltd as required through the Project Planning and Funding Agreement dated 6 October 2022 Auckland Light Rail Limited - Capital injection | 100% | 100% | No longer listed |
| Proportion of NZ Transport Agency projects under the Capital Capital Investment Package - Funding for Crown assets | 80% or greater | Not available | No longer listed |
| Investment Package delivered to agreed budget and timeframes Capital Investment Package - Funding for Crown assets | – | (see Note 1) | No longer listed |
| Successful implementation of planned systems capability improvements Maritime New Zealand Capital Expenditure PLA | Achieved | Achieved | No longer listed |
| Proportion of NZ Transport Agency Waka Kotahi Regional Regional State Highways | 80% or greater | Not available | No longer listed |
| Investment Opportunities (RIO) activities delivered to agreed budget and timeframes Regional State Highways | – | (see Note 1) | No longer listed |
| Community Connect is implemented in at least one major urban area in the short term Community Connect Programme | Achieved | Achieved | No longer listed |
| Kilometres of cycle ways delivered Mode-Shift - Planning, Infrastructure, Services, and Activities | 50 kilometres | Not available (see Note 2) | No longer listed |
| Number of new or upgraded bus stops Mode-Shift - Planning, Infrastructure, Services, and Activities | 500 | Not available (see Note 2) | No longer listed |
| Kilometres of bus priority lanes Mode-Shift - Planning, Infrastructure, Services, and Activities | 5 kilometres | Not available (see Note 2) | No longer listed |
| Number of suburbs that received walking and improvement projects Mode-Shift - Planning, Infrastructure, Services, and Activities | 30 suburbs | Not available (see Note 2) | No longer listed |
| Number of improvements for access to schools Mode-Shift - Planning, Infrastructure, Services, and Activities | 50 schools | Not available (see Note 2) | No longer listed |
| Percentage of minor resilience works completed (measured annually) North Island Weather Events - Road Response and Reinstatement | 100% | 100% | No longer listed |
| Percentage of programme completed for state highways (measured annually) North Island Weather Events - Road Response and Reinstatement | 100% | 100% | No longer listed |
| Proportion of NZ Transport Agency Waka Kotahi projects funded by the Provincial Growth Fund (PGF) delivered to budget and timeframes Tuawhenua Provincial Growth Fund - Transport Projects | 80% or greater | 80% | No longer listed |
| NZ Transport Agency Waka Kotahi Tuawhenua Provincial Growth Fund - Transport Projects | 17,827 17,827 | 10,200 | No longer listed |
Source: Treasury, Estimates of Appropriations, Budgets 2018–2025.
Capital: budgeted and spent
| Year | Budget | Late estimate | Spent |
|---|---|---|---|
| 2024/25 | $0.2m | $0.2m | $0.3m |
| 2023/24 | $0.2m | $0.2m | $0.1m |
| 2021/22 | $0.2m | $0.2m | $0.1m |
| 2020/21 | $0.2m | $0.0m | $0.0m |
| 2018/19 | $2.1m | $0.9m | $0.9m |
| 2016/17 | $0.8m | $0.8m | $0.4m |
| 2015/16 | $0.3m | $0.7m | $0.1m |
| 2014/15 | $0.3m | $0.5m | $0.1m |
Its own capital spending (buildings, IT, equipment). Budget: set before the year, and often a round or repeated figure rather than a plan; the late estimate is revised near the end, often to what will be spent. Departments' capital is spent under a standing authority, not a limit, and money moves between years as projects are rescheduled.
Its own running costs
The Ministry of Transport's running costs went from $36 million in 2017/18 to $51 million in 2024/25, up 43% (up 12% after inflation), while its staff numbers grew 32%. Its spending has differed from the late estimate by as much as 18% in a year.
Why it matters. Running costs (staff, buildings, IT, contractors) are what the agency controls itself. Growth well ahead of inflation and of staff numbers means each person costs more to support; regular top-ups mean the Budget figure understates what it really costs.
| Year | Budget | Late estimate | Spent |
|---|---|---|---|
| 2024/25 | $62m | $57m | $51m |
| 2023/24 | $76m | $70m | $60m |
| 2022/23 | $143m | $84m | $75m |
| 2021/22 | $51m | $64m | $60m |
| 2020/21 | $48m | $58m | $47m |
| 2019/20 | $49m | $60m | $51m |
| 2018/19 | $39m | $44m | $40m |
| 2017/18 | $37m | $39m | $36m |
Staff, buildings, IT and contractors: the money it spends running itself, as against the benefits, grants and other payments it administers, which follow demand and policy.
Serving the public
Requests for information
In Jan–Jun 2026 the Ministry of Transport completed 140 requests under the Official Information Act, 100% within the legal time limit (usually 20 working days). 14% had their deadline extended. It published 71 of its responses.
Requests and timeliness: the Public Service Commission's six-monthly OIA statistics, which every agency reports the same way. Complaints: the Ombudsman's own six-monthly data, counted the same way for every agency.
Share answered on time
% of requests completed within the legal time limit, each half-year
| Half-year | Requests | On time | Extended | Average working days |
|---|---|---|---|---|
| Jan–Jun 2026 | 140 | 100% | 14% | 15.8 |
| Jul–Dec 2025 | 93 | 99% | 13% | 13.0 |
| Jan–Jun 2025 | 101 | 96% | 13% | 14.9 |
| Jul–Dec 2024 | 172 | 95% | 13% | 16.7 |
| Jan–Jun 2024 | 227 | 95% | 12% | 16.0 |
| Jul–Dec 2023 | 117 | 98% | 13% | 16.0 |
Complaints to the Ombudsman
About its handling of information requests. Remedied: the agency changed its decision, released information or apologised. Upheld: the Ombudsman found it had got it wrong. How the Ombudsman records findings has changed over time, so compare remedied cases more than upheld ones. Over the last two years: 19.8 complaints remedied for every 1,000 requests it completed.
| Half-year | Received | Completed | Remedied | Upheld |
|---|---|---|---|---|
| Jan–Jun 2026 | 1 | 2 | 2 | 0 |
| Jul–Dec 2025 | 3 | 3 | 1 | 0 |
| Jan–Jun 2025 | 2 | 5 | 4 | 0 |
| Jul–Dec 2024 | 5 | 4 | 3 | 2 |
| Jan–Jun 2024 | 5 | 2 | 1 | 0 |
| Jul–Dec 2023 | 3 | 4 | 3 | 1 |
Compared with agencies like it
The Ministry of Transport is compared with the policy ministries. Ministries that mainly advise ministers and fund or oversee other organisations' work, rather than deliver services themselves.
The others: Department of the Prime Minister and Cabinet, Ministry for Culture and Heritage, Ministry for Ethnic Communities, Ministry for Pacific Peoples, Ministry for Regulation, Ministry for Women, Ministry for the Environment, Ministry of Defence, Ministry of Disabled People – Whaikaha, Ministry of Foreign Affairs and Trade, Ministry of Health, Ministry of Housing and Urban Development, Public Service Commission, Social Investment Agency, Te Puni Kōkiri, The Treasury.
| Measure | Ministry of Transport | Similar agencies' median | Lowest to highest, all agencies | Among similar agencies |
|---|---|---|---|---|
| Delivery | ||||
| Capital spent, % of what it budgeted (3 years) | 43% | 47% | equal 5th of 7 | |
| Information requests answered on time | 100% | 100% | 9th of 17 | |
| Ombudsman complaints remedied, per 1,000 requests | 19.8 | 12.2 | second highest of 12 | |
| Size, people and costs | ||||
| Staff (FTE) | 171 | 195 | 10th of 17 | |
| Staff, change on a year earlier | −14.7% | +1.6% | second lowest of 17 | |
| Average salary | $138k | $141k | 13th of 17 | |
| Gender pay gap | 1.2% | 7.7% | 13th of 16 | |
| Staff leaving by choice | 31.0% | 16.9% | highest of 17 | |
| Contractors, share of running costs | 9.0% | 5.7% | 4th of 16 | |
| Running costs per FTE | $254k | $236k | 5th of 16 | |
Only measures every agency reports the same way. Places count from the highest; where fewer than six similar agencies have a figure, no place is given. A place is not a grade: for most of these (pay, staff leaving, contractors, cost per person) neither end is simply better. Capital: last three years with a capital budget of $1m or more (Treasury). Information requests: share on time over the last year (Public Service Commission). Ombudsman: complaints remedied over the last two years per 1,000 requests completed. Staff, pay and turnover: Public Service Commission (departments only for pay). Running costs and contractors' share: Treasury and PSC, latest year.
People and money
Staff
Full-time equivalents, June each year
Average salary and gender pay gap
June each year
The workforce
June 2026, with the whole public service beside it where the Commission publishes the figure.
| Ministry of Transport | Public service | |
|---|---|---|
| Women | 56.0% | 61.2% |
| Women in senior management | 76.9% | 57.6% |
| Māori | 3.1% | 16.5% |
| Pacific peoples | 1.7% | 11.5% |
| Asian | 13.7% | 17.0% |
| On fixed-term contracts | 4.0% | 4.6% |
| Left by choice in the year | 31.0% | 10.8% |
| Redundancies in the year | 4 | – |
| Average age | 41.1 years | 44.7 years |
| Average years with the agency | 4.3 years | 8.4 years |
| Sick and domestic leave taken | 6.4 days | 10.4 days |
The money it manages
In 2024/25 the Ministry of Transport spent $9,059m through the appropriations it administers, $51m of it on running itself.
Spending through the vote it administers, 2024/25, including benefits, grants and funding for other bodies.
Appropriation by appropriation, 2024/25
| Appropriation | Budget | Spent |
|---|---|---|
| National Land Transport Programme (Vote Transport) | $3,363.7m | $3,933.9m |
| Government Policy Statement on Land Transport - Capital Grant (2024-2028) (Vote Transport) | – | $1,186.0m |
| Rail - Maintenance and Renewal of the Rail Network (2024-2028) (Vote Transport) | $153.3m | $742.7m |
| Capital Investment Package - Funding for Crown assets (Vote Transport) | $865.7m | $739.4m |
| Government Policy Statement on Land Transport Loan (2024 -2028) (Vote Transport) | – | $460.0m |
| Rail - KiwiRail Holdings Limited (Vote Transport) | $685.5m | $378.4m |
| North Island Weather Events - State Highway Recovery (Vote Transport) | $295.6m | $239.1m |
| Auckland City Rail Link - Capital (2024-2028) (Vote Transport) | $303.0m | $219.0m |
| Local Road Recovery Costs (Vote Transport) | $280.0m | $168.1m |
| Eastern Busway Project (Vote Transport) | $84.4m | $84.4m |
| Civil Aviation Authority – Core Functions (Vote Transport) | $89.0m | $76.3m |
| COVID-19 – NLTF Capital Cost Pressure Funding (Vote Transport) | $0.0m | $75.8m |
| Clean Vehicle Standard - Issue of Credits (Vote Transport) | $150.0m | $63.3m |
| COVID-19 – NLTF Operating Cost Pressure and Revenue Shortfall Funding (Vote Transport) | $1.0m | $62.5m |
| Transport - Policy advice, ministerial servicing, governance, and other functions (running costs, Vote Transport) | $55.9m | $46.9m |
| Public Transport Concessions for Cardholders (Vote Transport) | $38.8m | $40.5m |
| New Zealand Transport Agency: Regulatory Functions (Vote Transport) | $41.8m | $40.2m |
| Housing Infrastructure Fund Loans 2023-2028 (Vote Transport) | $50.0m | $38.5m |
| Mode-Shift - Third-Party Projects and Activities (Vote Transport) | $52.8m | $34.4m |
| Search and Rescue and Recreational Boating Safety Activities (Vote Transport) | $30.1m | $34.1m |
| National Land Transport Programme - New Infrastructure for and Renewal of State Highways (Vote Transport) | $247.1m | $29.4m |
| Weather Forecasts and Warnings (Vote Transport) | $28.8m | $28.8m |
| Improving Resilience of the Roading Network – State Highways (Vote Transport) | $53.5m | $28.0m |
| Ngauranga to Petone Shared Pathway Project (Vote Transport) | $22.6m | $23.6m |
| Local Road Response Costs (Vote Transport) | – | $23.3m |
| Search and Rescue and related Frontline Safety and Prevention Services (Vote Transport) | – | $22.1m |
| New Zealand Transport Agency: Doubtful Debt Provision (Vote Transport) | $18.0m | $20.8m |
| Total Mobility Services Concessions (Vote Transport) | $12.0m | $20.3m |
| Third party projects (Vote Transport) | – | $16.9m |
| Retaining and Recruiting Bus Drivers (Vote Transport) | $20.5m | $15.0m |
| Water Search, Rescue and Safety Frontline Services (Vote Transport) | $28.8m | $14.4m |
| Rail - New Zealand Railways Corporation Equity Injection 2024-2029 (Vote Transport) | $51.0m | $13.9m |
| Health and Safety at Work Activities - Maritime (Vote Transport) | $13.1m | $13.1m |
| Civil Aviation Authority – Capital Injection (Vote Transport) | $22.5m | $11.8m |
| Maritime Regulatory and Response Services (Vote Transport) | $10.7m | $10.9m |
| Community Connect Programme - Public Transport Concessions (Vote Transport) | $24.3m | $10.4m |
| Infrastructure Projects (Vote Transport) | $8.0m | $9.9m |
| Improving Resilience of the Roading Network – Local Roads (Vote Transport) | $38.5m | $9.7m |
| Rail – Grants (Vote Transport) | $13.8m | $9.1m |
| Accident or Incident Investigation and Reporting (Vote Transport) | $8.7m | $8.7m |
| Road User Charges Investigation and Enforcement (Vote Transport) | $3.8m | $7.5m |
| New Zealand Transport Agency: Regulatory Services (Vote Transport) | $9.0m | $5.8m |
| Maritime New Zealand Capital Expenditure (Vote Transport) | $0.1m | $5.8m |
| Auckland City Rail Link - Operating (Vote Transport) | $9.4m | $4.1m |
| Minor Resilience Works (Vote Transport) | – | $4.0m |
| Health and Safety at Work Activities - Civil Aviation (Vote Transport) | $4.0m | $4.0m |
| Public Transport Bus Decarbonisation (Vote Transport) | $15.2m | $3.8m |
| Civil Aviation and Maritime Security Services (Vote Transport) | $3.0m | $3.0m |
| Search and Rescue Activity Coordination (running costs, Vote Transport) | $4.3m | $2.8m |
| Joint Venture Airports - Crown Contribution 2023-2028 (Vote Transport) | $4.2m | $2.4m |
| Road User Charges Refunds (Vote Transport) | $3.0m | $2.0m |
| Enabling Infrastructure Projects (Vote Transport) | $2.0m | $1.6m |
| Search and Rescue Training and Training Coordination (running costs, Vote Transport) | $1.5m | $1.4m |
| Lower North Island Rail Passenger Rail Network Improvements - Local Council Grant (Vote Transport) | – | $1.0m |
| Membership of International Organisations (Vote Transport) | $0.9m | $1.0m |
| Improving Resilience of the Roading Network – Operating Costs (Vote Transport) | $1.3m | $1.0m |
| Regional State Highways (Vote Transport) | $3.0m | $0.9m |
| Auckland City Rail Link Targeted Hardship Fund (Vote Transport) | $1.8m | $0.8m |
| Emergency Ocean Response Capability (Vote Transport) | – | $0.8m |
| Supporting Resilient Shipping to the Chatham Islands (Vote Transport) | – | $0.8m |
| Rail Projects (Vote Transport) | $10.6m | $0.7m |
| Administration of the Community Connect Programme (Vote Transport) | $0.2m | $0.7m |
| Mode-Shift - Operating Costs (Vote Transport) | $2.0m | $0.3m |
| Ministry of Transport - Capital Expenditure (Vote Transport) | $0.2m | $0.3m |
| Recreational Aviation Safety Activities (Vote Transport) | $0.2m | $0.1m |
| Supporting Regional and Infrastructure Projects (Vote Transport) | $0.2m | $0.1m |
| Administration of the Public Transport Concessions Scheme (Vote Transport) | $0.1m | $0.1m |
| Transport Connectivity with Isolated Communities (Vote Transport) | – | $0.1m |
| Ground-Based Navigation Aids for Aviation Safety (Vote Transport) | $0.4m | $0.1m |
| Rail - KiwiRail Equity Injection (Vote Transport) | $4.0m | $0.0m |
| Operating costs (Vote Transport) | – | $-1.7m |
Contractors and consultants
$ million a year, years to June (Public Service Commission)
About these numbers
What it does, the sentence under the agency's name, was written for this site; the spending lines and their descriptions are Parliament's. The six questions and what's unusual are worked out by fixed rules from the figures on this page, the same for every agency; they report figures and don't rate the agency. Outcomes come from the data on the site's topic pages; the agency is one influence on them among many. Standards and forecasts are from the Estimates of Appropriations and the agency's annual report: they are the agency's own standards. Capital and running costs are Treasury's appropriations data.
Staff, pay and contractors are from the Public Service Commission's workforce data, which measures every department the same way.
Sources: Public Service Commission Te Kawa Mataaho, Workforce Data and OIA statistics; Office of the Ombudsman; Treasury, Estimates of Appropriations; NZ Transport Agency, Crash Analysis System.