better stats nz
Government / Agencies / Ministry of Transport

Ministry of Transport

Advises on transport policy and oversees the transport Crown entities, including the NZ Transport Agency.

Department · one of 17 policy ministries

171full-time equivalent staff, June 2026, −14.7% on a year earlier
$51mits own running costs in 2024/25, and $9,008m of benefits, grants and other payments it administers
$8.8mon contractors and consultants in 2025/26 ($4.6m the year before)
100%of information requests answered on time in the last year

In brief

The Ministry of Transport has 171 full-time equivalent staff, 8% fewer than five years ago.

In 2024/25 it spent $51 million on its own work and passed on $9.0 billion, most of it as services it pays others to deliver.

Its largest group of staff is policy analysts, 58% of the total, then managers (17%).

What it does, in more detail

What's unusual

  • Against its promisesIt dropped 51 of the 156 performance measures it had a year earlier in Budget 2025, and added 15.
  • In its areaRoad deaths: 268 in 2025, down from 290 a year earlier.
  • Against its own pastStaff down 15% in a year, to 171 FTE.
  • Against other agenciesStaff leaving by choice: 31.0%, the highest of the 17 policy ministries with a figure (their median 16.9%).

Chosen by rule, not by hand: a result against what it forecast, a figure at its highest or lowest in at least eight years, or one at either end of the policy ministries. Unusual isn't the same as wrong; it's where to look first.

Six questions, the same for every agency

Each is answered with a figure from the best evidence this site has, and what that figure rests on. This site doesn't rate agencies: they set their own standards, outcomes have many causes, and budgets are not always plans. Where there is no evidence, it says so.

How are things going in its area?

Improving

Road deaths: 268 in 2025, down from 290 a year earlier.

What this rests onGovernment targets: the Department of the Prime Minister and Cabinet's own rating each quarter. Outcomes: official statistics; many things besides the agency move them, so read them as the state of its area, not a score for it.

How many of its own standards does it meet?

Not yet checked (no evidence here)

Budget 2025 lists 117 performance measures for it. In May it expected to miss 1 of the 66 that can be scored. The audited results are in its annual report, which this site hasn't read yet, so its own forecast is all there is.

What this rests onThe agency's own standards, set in the Estimates and audited in its annual report. They show whether it did what it said it would, not whether it promised the right things, and can't be compared between agencies.

How much of its capital budget does it spend?

43% of budget spent

Over 2018/19 it spent $0.9 million on capital, against $2.1 million in the Budgets at the start of those years and $0.9 million in the estimates made late in each year.

What this rests onCapital spending (buildings, IT, equipment) against the figure in the Budget at the start of each year, over the last three years. Read it with care: departments' capital is spent under a standing authority, not a limit; the Budget-day figure is often a round or repeated amount rather than a plan; and money is routinely moved between years as projects are rescheduled. A low share can mean late projects, rescheduling or savings; a high one, money added during the year. Source: Treasury.

How close is its spending to its budget?

17% under budget

It spent $51 million running itself in 2024/25, 17% less than the figure set on Budget day. The Ministry of Transport's running costs went from $36 million in 2017/18 to $51 million in 2024/25, up 43% (up 12% after inflation), while its staff numbers grew 32%.

What this rests onIts own running costs (staff, buildings, IT, contractors) against the figure set on Budget day, from Treasury's appropriations data. Parliament can add money during the year, so ending above the Budget-day figure is not overspending; it shows how well that figure predicted the cost.

How quickly does it answer information requests?

100% on time

It answered 233 information requests in the last year, 100% within the legal time limit (similar agencies' median: 100%). For every 1,000 requests, 19.8 ended with a complaint to the Ombudsman that the agency put right (similar agencies' median: 12.2).

What this rests onRequests under the Official Information Act, from the Public Service Commission's statistics, and complaints about them to the Ombudsman: the one service every agency provides and reports the same way. It says little about an agency's main work.

How many of its staff are leaving?

31% left by choice

31% of its staff left by choice in 2025/26, against 28% a year on average over the 5 years before (similar agencies' median: 16.9%). Staff numbers fell 15% in the year. 4 people were made redundant.

What this rests onThe Public Service Commission's workforce data, counted the same way for every department. High turnover can mean a troubled workplace or a strong job market for its skills; restructuring shows up in staff numbers and redundancies.
A figureNo evidence here

What it does

Parliament votes money to the Ministry of Transport line by line, and each line says what it is for. That is the plainest account of its work, alongside the jobs its staff do.

Where the money went, 2024/25

Services it pays others to deliver$5,195m57%
Investment in other public bodies$3,466m38%
Grants, subsidies and other payments$348m4%
Its own work$51.0m<1%
Its own buildings, IT and equipment$0.3m<1%

$9,060m through 70 appropriations in Vote Transport. “Its own work” is what the agency controls; the rest it passes on, and follows demand and policy. Source: Treasury.

What its staff do

Share of staff by occupation, June 2026 (public service share in brackets)

Policy analysts (6%)58%
Managers (12%)17%
Legal, HR and finance professionals (5%)10%
Clerical and administrative workers (8%)7%
Information professionals (15%)6%
Other professionals (4%)2%
ICT professionals and technicians (4%)1%

Its largest lines of spending

  • National Land Transport Programme$3,934mThe estimated amount to be spent on activities under the National Land Transport Programme, as authorised by section 9 (3) and (4) of the Land Transport Management Act 2003.
  • Government Policy Statement on Land Transport - Capital Grant (2024-2028)$1,186mProviding additional capital funding to the National Land Transport Fund to give effect to the Government Policy Statement on land transport.
  • Rail - Maintenance and Renewal of the Rail Network (2024-2028)$743mExpenses incurred for the maintenance and renewal of the rail network including for the approved Rail Network Investment Programme.
  • Capital Investment Package - Funding for Crown assets$739mInvestment in specified roading, walking, and cycling projects that support the announced objectives of the Capital Investment Package and that will result in assets owned by the Crown.
  • Government Policy Statement on Land Transport Loan (2024 -2028)$460mA loan to NZ Transport Agency to give effect to the Government Policy Statement on land transport.
  • Rail - KiwiRail Holdings Limited$378mA capital injection to KiwiRail Holdings Limited to finance approved capital expenditure on the New Zealand rail system.

The 6 largest of 70, with Parliament's description of what each may be spent on. Every appropriation.

How things are going in its area

The results the Ministry of Transport works towards. Many things besides the agency move them, so read these as the state of its area rather than a score for the agency alone.

Official statistics in its area

The latest figure for each, the change on a year earlier and the last eight or so years. Survey figures count as changed only when the difference is outside the survey's margin of error.

Road deaths 268 2025 Down from 290 a year earlier: better NZ Transport Agency, Crash Analysis System · More on this

What it promised, and what happened

Each Budget sets the standards the Ministry of Transport is funded to meet and the money it may spend. These are its own standards, so they show whether it does what it said it would, not whether those were the right things to promise.

Budget 2025 set 117 performance measures for the Ministry of Transport. Over the last three Budgets it dropped 113 and added 40, and lowered none. When that Budget came out, it expected to have met 65 of the 66 standards it could be judged on for the year then ending, and to have missed 1. Whether it actually met them is in its annual report, which this site hasn't read yet, so the forecast can't be checked.

Why it matters. These standards are what Parliament funds the agency to deliver. Agencies set them and report against them themselves, so watch for standards dropped or lowered, and for forecasts of success the annual report doesn't bear out.

Its standards, Budget by Budget

Expected to meet or miss: its estimated result for the year then ending against that year's standard, where both can be read as figures; the rest are worded standards, ranges or new measures. Dropped: marked removed in the Estimates, or with no close match in the next Budget.

BudgetMeasuresNewDroppedExpected to meetExpected to missLoweredRaised
2025117155165102
202415693677200
2023171162675100
2022158291466100
2021117334143300
2020128342651100
2019124292855000
20181108–57001

Measures dropped in Budget 2025

MeasureLast standardExpected resultHow
Support delivered to the Airspace Integration Trials programme as agreed with the Ministry of Business, Innovation and Employment (MBIE)
Civil Aviation and Maritime Security Services
100%100%Measure removed
Number of community provider organisations who have accessed a Community Driver Testing Officer or Driver Testing Officer for dedicated Class 1 practical tests for students (see
New Zealand Transport Agency: Regulatory Services
26 or greater35Measure removed
Establish investment criteria for the Coastal Shipping Resilience Fund
Coastal Shipping Resilience Fund
AchievedAchievedMeasure removed
Survey results show that the New Zealand Search and Rescue Council is satisfied with the provision of effective support services and policy advice for the New Zealand search and rescue sector
Search and Rescue Activity Coordination PLA
95% or higher100%No longer listed
Delivery of the National Search and Rescue Support Programme including the provision of governance, leadership, and strategic support for the Search and Rescue sector
Search and Rescue Activity Coordination PLA
90%90%No longer listed
Research determining recommendations for the best long-term institutional arrangements to support EV charging is completed Milford Sound/Piopiotahi Aerodrome
Search and Rescue Training and Training Coordination
100%No longer a measureNo longer listed
The Milford Sound/Piopiotahi aerodrome operation will conform with appropriate Civil Aviation Authority safety requirements
Search and Rescue Training and Training Coordination
AchievedAchievedNo longer listed
The operating costs for the Milford Sound/Piopiotahi aerodrome are within third-party revenue Fuel Excise Duty Refund Administration
Search and Rescue Training and Training Coordination
AchievedNot AchievedNo longer listed
Average number of days taken to process refunds of fuel excise duty
Search and Rescue Training and Training Coordination
20 working days or less5.5 working days 20 working days or lessNo longer listed
Milestones are completed in line with the programme developed and maintained by ALR Ltd as required through the Project Planning and Funding Agreement dated 6 October 2022
Auckland Light Rail - Detailed Planning Phase
100%100%No longer listed
Disposal of the property at 317 New North Road and disestablishment of the company
Auckland Light Rail - Detailed Planning Phase
New measureNew measureNo longer listed
We will ensure New Zealand’s obligations as a signatory State to the Chicago convention are met, where appropriate for – New Zealand, through, Maintained alignment with existing Standards and Recommended Practices (SARPs)
Civil Aviation and Maritime Security Services
MaintainedMaintainedNo longer listed
We will ensure New Zealand’s obligations as a signatory State to the Chicago convention are met, where appropriate for – New Zealand, through, “Filling of Differences” completed within required timeframes for new SARPS that are the responsibility of the Civil Aviation Authority
Civil Aviation and Maritime Security Services
100%100%No longer listed
Reports, correspondence and Parliamentary questions acceptable to the Minister (assessed by biannual survey) based on a scale of “exceeded expectations”, “met expectations” or “requires improvement”
Civil Aviation and Maritime Security Services
Meet or exceed expectationsMet expectationsNo longer listed
The policy advice we provide to Ministers, government departments and agencies will meet the CAA’s internal guidelines for quality policy advice
Civil Aviation and Maritime Security Services
100%100%No longer listed
Maintain appropriate capability for core functions - appropriate resourcing to meet service level requirements
Civil Aviation Authority - Core Functions
New measureNew measureNo longer listed
We include aviation-specific Health and Safety guidance in safety and security guidance material published by the Authority We will complete health and safety assessments, investigations and audits within
Health and Safety at Work Activities - Civil Aviation
8-128No longer listed
180 days
Health and Safety at Work Activities - Civil Aviation
70%70%No longer listed
12 months
Health and Safety at Work Activities - Civil Aviation
100%100%No longer listed
Number of testing days that community provider organisations have booked for Class 1 practical dedicated student bookings
Land Transport Regulatory Services
600 or greater600No longer listed
Number of advisors supporting community driver training, education and testing
Land Transport Regulatory Services
11 or greater11No longer listed
The number of Maritime Incident Response Team (MIRT) exercises and workshops completed annually
Maritime Regulatory and Response Services
126No longer listed
The number of recreational craft information and education campaigns delivered
Maritime Regulatory and Response Services
3-53-5No longer listed
The percentage of recreational craft surveys undertaken that meet Maritime NZ’s quality criteria
Maritime Regulatory and Response Services
100%100%No longer listed
The percentage of allocated recreational craft investment funding paid out to key target areas.
Maritime Regulatory and Response Services
95% or greater95% or greaterNo longer listed
Proportion of local road improvement activities funded by the
National Land Transport Programme PLA
80% or greaterNot availableNo longer listed
Proportion of state highway improvement activities funded by the
National Land Transport Programme Capital PLA
80% or greaterNot availableNo longer listed
National Land Transport Fund delivered to agreed standards and timeframes
National Land Transport Programme Capital PLA
–(see Note 2)No longer listed
Punctuality of metro rail services
National Land Transport Programme PLA
95% or greaterNot available (see Note 2)No longer listed
Proportion of cycleways, pathways and shared paths delivered against what was funded
National Land Transport Programme PLA
Baseline resetNot available (see Note 2)No longer listed
Freight travel time reliability
National Land Transport Programme PLA
90% or greater90%No longer listed
Amount of freight carried by rail
National Land Transport Programme PLA
4,050 Net tonne kms of 4,050 Net tonne kms of 4,170 Net tonne kms offreight carried by rail freight carried by rail freight carried by railNo longer listed
Provision of appropriate Search and Rescue services to Coordination Authorities on request
Search and Rescue and Recreational Boating Safety Activities PLA
100%99%No longer listed
Provision of agreed New Zealand avalanche hazard advisory services
Search and Rescue and Recreational Boating Safety Activities PLA
100%100%No longer listed
Payments are made within 30 days of City Rail Link Limited receiving a completed application
Auckland City Rail Link Targeted Hardship Fund
100%100%No longer listed
Milestones are completed in line with the programme developed and maintained by Auckland Light Rail Ltd as required through the Project Planning and Funding Agreement dated 6 October 2022
Auckland Light Rail Limited - Capital injection
100%100%No longer listed
Proportion of NZ Transport Agency projects under the Capital
Capital Investment Package - Funding for Crown assets
80% or greaterNot availableNo longer listed
Investment Package delivered to agreed budget and timeframes
Capital Investment Package - Funding for Crown assets
–(see Note 1)No longer listed
Successful implementation of planned systems capability improvements
Maritime New Zealand Capital Expenditure PLA
AchievedAchievedNo longer listed
Proportion of NZ Transport Agency Waka Kotahi Regional
Regional State Highways
80% or greaterNot availableNo longer listed
Investment Opportunities (RIO) activities delivered to agreed budget and timeframes
Regional State Highways
–(see Note 1)No longer listed
Community Connect is implemented in at least one major urban area in the short term
Community Connect Programme
AchievedAchievedNo longer listed
Kilometres of cycle ways delivered
Mode-Shift - Planning, Infrastructure, Services, and Activities
50 kilometresNot available (see Note 2)No longer listed
Number of new or upgraded bus stops
Mode-Shift - Planning, Infrastructure, Services, and Activities
500Not available (see Note 2)No longer listed
Kilometres of bus priority lanes
Mode-Shift - Planning, Infrastructure, Services, and Activities
5 kilometresNot available (see Note 2)No longer listed
Number of suburbs that received walking and improvement projects
Mode-Shift - Planning, Infrastructure, Services, and Activities
30 suburbsNot available (see Note 2)No longer listed
Number of improvements for access to schools
Mode-Shift - Planning, Infrastructure, Services, and Activities
50 schoolsNot available (see Note 2)No longer listed
Percentage of minor resilience works completed (measured annually)
North Island Weather Events - Road Response and Reinstatement
100%100%No longer listed
Percentage of programme completed for state highways (measured annually)
North Island Weather Events - Road Response and Reinstatement
100%100%No longer listed
Proportion of NZ Transport Agency Waka Kotahi projects funded by the Provincial Growth Fund (PGF) delivered to budget and timeframes
Tuawhenua Provincial Growth Fund - Transport Projects
80% or greater80%No longer listed
NZ Transport Agency Waka Kotahi
Tuawhenua Provincial Growth Fund - Transport Projects
17,827 17,82710,200No longer listed

Source: Treasury, Estimates of Appropriations, Budgets 2018–2025.

Capital: budgeted and spent

YearBudgetLate estimateSpent
2024/25$0.2m$0.2m$0.3m
2023/24$0.2m$0.2m$0.1m
2021/22$0.2m$0.2m$0.1m
2020/21$0.2m$0.0m$0.0m
2018/19$2.1m$0.9m$0.9m
2016/17$0.8m$0.8m$0.4m
2015/16$0.3m$0.7m$0.1m
2014/15$0.3m$0.5m$0.1m

Its own capital spending (buildings, IT, equipment). Budget: set before the year, and often a round or repeated figure rather than a plan; the late estimate is revised near the end, often to what will be spent. Departments' capital is spent under a standing authority, not a limit, and money moves between years as projects are rescheduled.

Its own running costs

The Ministry of Transport's running costs went from $36 million in 2017/18 to $51 million in 2024/25, up 43% (up 12% after inflation), while its staff numbers grew 32%. Its spending has differed from the late estimate by as much as 18% in a year.

Why it matters. Running costs (staff, buildings, IT, contractors) are what the agency controls itself. Growth well ahead of inflation and of staff numbers means each person costs more to support; regular top-ups mean the Budget figure understates what it really costs.

YearBudgetLate estimateSpent
2024/25$62m$57m$51m
2023/24$76m$70m$60m
2022/23$143m$84m$75m
2021/22$51m$64m$60m
2020/21$48m$58m$47m
2019/20$49m$60m$51m
2018/19$39m$44m$40m
2017/18$37m$39m$36m

Staff, buildings, IT and contractors: the money it spends running itself, as against the benefits, grants and other payments it administers, which follow demand and policy.

Serving the public

Requests for information

In Jan–Jun 2026 the Ministry of Transport completed 140 requests under the Official Information Act, 100% within the legal time limit (usually 20 working days). 14% had their deadline extended. It published 71 of its responses.

Requests and timeliness: the Public Service Commission's six-monthly OIA statistics, which every agency reports the same way. Complaints: the Ombudsman's own six-monthly data, counted the same way for every agency.

Share answered on time

% of requests completed within the legal time limit, each half-year

Half-yearRequestsOn timeExtendedAverage working days
Jan–Jun 2026140100%14%15.8
Jul–Dec 20259399%13%13.0
Jan–Jun 202510196%13%14.9
Jul–Dec 202417295%13%16.7
Jan–Jun 202422795%12%16.0
Jul–Dec 202311798%13%16.0

Complaints to the Ombudsman

About its handling of information requests. Remedied: the agency changed its decision, released information or apologised. Upheld: the Ombudsman found it had got it wrong. How the Ombudsman records findings has changed over time, so compare remedied cases more than upheld ones. Over the last two years: 19.8 complaints remedied for every 1,000 requests it completed.

Half-yearReceivedCompletedRemediedUpheld
Jan–Jun 20261220
Jul–Dec 20253310
Jan–Jun 20252540
Jul–Dec 20245432
Jan–Jun 20245210
Jul–Dec 20233431

Compared with agencies like it

The Ministry of Transport is compared with the policy ministries. Ministries that mainly advise ministers and fund or oversee other organisations' work, rather than deliver services themselves.

The others: Department of the Prime Minister and Cabinet, Ministry for Culture and Heritage, Ministry for Ethnic Communities, Ministry for Pacific Peoples, Ministry for Regulation, Ministry for Women, Ministry for the Environment, Ministry of Defence, Ministry of Disabled People – Whaikaha, Ministry of Foreign Affairs and Trade, Ministry of Health, Ministry of Housing and Urban Development, Public Service Commission, Social Investment Agency, Te Puni Kōkiri, The Treasury.

MeasureMinistry of TransportSimilar agencies' medianLowest to highest, all agenciesAmong similar agencies
Delivery
Capital spent, % of what it budgeted (3 years)43%47%
equal 5th of 7
Information requests answered on time100%100%
9th of 17
Ombudsman complaints remedied, per 1,000 requests19.812.2
second highest of 12
Size, people and costs
Staff (FTE)171195
10th of 17
Staff, change on a year earlier−14.7%+1.6%
second lowest of 17
Average salary$138k$141k
13th of 17
Gender pay gap1.2%7.7%
13th of 16
Staff leaving by choice31.0%16.9%
highest of 17
Contractors, share of running costs9.0%5.7%
4th of 16
Running costs per FTE$254k$236k
5th of 16
Ministry of TransportSimilar agenciesTheir median

Only measures every agency reports the same way. Places count from the highest; where fewer than six similar agencies have a figure, no place is given. A place is not a grade: for most of these (pay, staff leaving, contractors, cost per person) neither end is simply better. Capital: last three years with a capital budget of $1m or more (Treasury). Information requests: share on time over the last year (Public Service Commission). Ombudsman: complaints remedied over the last two years per 1,000 requests completed. Staff, pay and turnover: Public Service Commission (departments only for pay). Running costs and contractors' share: Treasury and PSC, latest year.

People and money

Staff

Full-time equivalents, June each year

Average salary and gender pay gap

June each year

Ministry of TransportPublic service

The workforce

June 2026, with the whole public service beside it where the Commission publishes the figure.

Ministry of TransportPublic service
Women56.0%61.2%
Women in senior management76.9%57.6%
Māori3.1%16.5%
Pacific peoples1.7%11.5%
Asian13.7%17.0%
On fixed-term contracts4.0%4.6%
Left by choice in the year31.0%10.8%
Redundancies in the year4–
Average age41.1 years44.7 years
Average years with the agency4.3 years8.4 years
Sick and domestic leave taken6.4 days10.4 days

The money it manages

In 2024/25 the Ministry of Transport spent $9,059m through the appropriations it administers, $51m of it on running itself.

Spending through the vote it administers, 2024/25, including benefits, grants and funding for other bodies.

Appropriation by appropriation, 2024/25

AppropriationBudgetSpent
National Land Transport Programme (Vote Transport)$3,363.7m$3,933.9m
Government Policy Statement on Land Transport - Capital Grant (2024-2028) (Vote Transport)–$1,186.0m
Rail - Maintenance and Renewal of the Rail Network (2024-2028) (Vote Transport)$153.3m$742.7m
Capital Investment Package - Funding for Crown assets (Vote Transport)$865.7m$739.4m
Government Policy Statement on Land Transport Loan (2024 -2028) (Vote Transport)–$460.0m
Rail - KiwiRail Holdings Limited (Vote Transport)$685.5m$378.4m
North Island Weather Events - State Highway Recovery (Vote Transport)$295.6m$239.1m
Auckland City Rail Link - Capital (2024-2028) (Vote Transport)$303.0m$219.0m
Local Road Recovery Costs (Vote Transport)$280.0m$168.1m
Eastern Busway Project (Vote Transport)$84.4m$84.4m
Civil Aviation Authority – Core Functions (Vote Transport)$89.0m$76.3m
COVID-19 – NLTF Capital Cost Pressure Funding (Vote Transport)$0.0m$75.8m
Clean Vehicle Standard - Issue of Credits (Vote Transport)$150.0m$63.3m
COVID-19 – NLTF Operating Cost Pressure and Revenue Shortfall Funding (Vote Transport)$1.0m$62.5m
Transport - Policy advice, ministerial servicing, governance, and other functions (running costs, Vote Transport)$55.9m$46.9m
Public Transport Concessions for Cardholders (Vote Transport)$38.8m$40.5m
New Zealand Transport Agency: Regulatory Functions (Vote Transport)$41.8m$40.2m
Housing Infrastructure Fund Loans 2023-2028 (Vote Transport)$50.0m$38.5m
Mode-Shift - Third-Party Projects and Activities (Vote Transport)$52.8m$34.4m
Search and Rescue and Recreational Boating Safety Activities (Vote Transport)$30.1m$34.1m
National Land Transport Programme - New Infrastructure for and Renewal of State Highways (Vote Transport)$247.1m$29.4m
Weather Forecasts and Warnings (Vote Transport)$28.8m$28.8m
Improving Resilience of the Roading Network – State Highways (Vote Transport)$53.5m$28.0m
Ngauranga to Petone Shared Pathway Project (Vote Transport)$22.6m$23.6m
Local Road Response Costs (Vote Transport)–$23.3m
Search and Rescue and related Frontline Safety and Prevention Services (Vote Transport)–$22.1m
New Zealand Transport Agency: Doubtful Debt Provision (Vote Transport)$18.0m$20.8m
Total Mobility Services Concessions (Vote Transport)$12.0m$20.3m
Third party projects (Vote Transport)–$16.9m
Retaining and Recruiting Bus Drivers (Vote Transport)$20.5m$15.0m
Water Search, Rescue and Safety Frontline Services (Vote Transport)$28.8m$14.4m
Rail - New Zealand Railways Corporation Equity Injection 2024-2029 (Vote Transport)$51.0m$13.9m
Health and Safety at Work Activities - Maritime (Vote Transport)$13.1m$13.1m
Civil Aviation Authority – Capital Injection (Vote Transport)$22.5m$11.8m
Maritime Regulatory and Response Services (Vote Transport)$10.7m$10.9m
Community Connect Programme - Public Transport Concessions (Vote Transport)$24.3m$10.4m
Infrastructure Projects (Vote Transport)$8.0m$9.9m
Improving Resilience of the Roading Network – Local Roads (Vote Transport)$38.5m$9.7m
Rail – Grants (Vote Transport)$13.8m$9.1m
Accident or Incident Investigation and Reporting (Vote Transport)$8.7m$8.7m
Road User Charges Investigation and Enforcement (Vote Transport)$3.8m$7.5m
New Zealand Transport Agency: Regulatory Services (Vote Transport)$9.0m$5.8m
Maritime New Zealand Capital Expenditure (Vote Transport)$0.1m$5.8m
Auckland City Rail Link - Operating (Vote Transport)$9.4m$4.1m
Minor Resilience Works (Vote Transport)–$4.0m
Health and Safety at Work Activities - Civil Aviation (Vote Transport)$4.0m$4.0m
Public Transport Bus Decarbonisation (Vote Transport)$15.2m$3.8m
Civil Aviation and Maritime Security Services (Vote Transport)$3.0m$3.0m
Search and Rescue Activity Coordination (running costs, Vote Transport)$4.3m$2.8m
Joint Venture Airports - Crown Contribution 2023-2028 (Vote Transport)$4.2m$2.4m
Road User Charges Refunds (Vote Transport)$3.0m$2.0m
Enabling Infrastructure Projects (Vote Transport)$2.0m$1.6m
Search and Rescue Training and Training Coordination (running costs, Vote Transport)$1.5m$1.4m
Lower North Island Rail Passenger Rail Network Improvements - Local Council Grant (Vote Transport)–$1.0m
Membership of International Organisations (Vote Transport)$0.9m$1.0m
Improving Resilience of the Roading Network – Operating Costs (Vote Transport)$1.3m$1.0m
Regional State Highways (Vote Transport)$3.0m$0.9m
Auckland City Rail Link Targeted Hardship Fund (Vote Transport)$1.8m$0.8m
Emergency Ocean Response Capability (Vote Transport)–$0.8m
Supporting Resilient Shipping to the Chatham Islands (Vote Transport)–$0.8m
Rail Projects (Vote Transport)$10.6m$0.7m
Administration of the Community Connect Programme (Vote Transport)$0.2m$0.7m
Mode-Shift - Operating Costs (Vote Transport)$2.0m$0.3m
Ministry of Transport - Capital Expenditure (Vote Transport)$0.2m$0.3m
Recreational Aviation Safety Activities (Vote Transport)$0.2m$0.1m
Supporting Regional and Infrastructure Projects (Vote Transport)$0.2m$0.1m
Administration of the Public Transport Concessions Scheme (Vote Transport)$0.1m$0.1m
Transport Connectivity with Isolated Communities (Vote Transport)–$0.1m
Ground-Based Navigation Aids for Aviation Safety (Vote Transport)$0.4m$0.1m
Rail - KiwiRail Equity Injection (Vote Transport)$4.0m$0.0m
Operating costs (Vote Transport)–$-1.7m

Contractors and consultants

$ million a year, years to June (Public Service Commission)

TotalOf which capital

About these numbers

What it does, the sentence under the agency's name, was written for this site; the spending lines and their descriptions are Parliament's. The six questions and what's unusual are worked out by fixed rules from the figures on this page, the same for every agency; they report figures and don't rate the agency. Outcomes come from the data on the site's topic pages; the agency is one influence on them among many. Standards and forecasts are from the Estimates of Appropriations and the agency's annual report: they are the agency's own standards. Capital and running costs are Treasury's appropriations data.

Staff, pay and contractors are from the Public Service Commission's workforce data, which measures every department the same way.

Sources: Public Service Commission Te Kawa Mataaho, Workforce Data and OIA statistics; Office of the Ombudsman; Treasury, Estimates of Appropriations; NZ Transport Agency, Crash Analysis System.