NZ Transport Agency Waka Kotahi
Plans, funds, builds and maintains state highways, funds local roads and public transport, and licenses drivers and vehicles.
Crown entity · one of 4 crown entities
In brief
The NZ Transport Agency Waka Kotahi has 2,764 full-time equivalent staff.
Crown entities are funded through other agencies' budgets, levies and charges, so Treasury's spending data doesn't cover it and this page has less about its money.
What's unusual
- In its areaRoad deaths: 268 in 2025, down from 290 a year earlier.
Chosen by rule, not by hand: a result against what it forecast, a figure at its highest or lowest in at least eight years, or one at either end of the Crown entities here. Unusual isn't the same as wrong; it's where to look first.
Six questions, the same for every agency
Each is answered with a figure from the best evidence this site has, and what that figure rests on. This site doesn't rate agencies: they set their own standards, outcomes have many causes, and budgets are not always plans. Where there is no evidence, it says so.
How are things going in its area?
Road deaths: 268 in 2025, down from 290 a year earlier.
What this rests on
Government targets: the Department of the Prime Minister and Cabinet's own rating each quarter. Outcomes: official statistics; many things besides the agency move them, so read them as the state of its area, not a score for it.How many of its own standards does it meet?
Crown entities set their standards in their own statements of performance expectations, not in the Estimates, and this site hasn't read them.
What this rests on
The agency's own standards, set in the Estimates and audited in its annual report. They show whether it did what it said it would, not whether it promised the right things, and can't be compared between agencies.How much of its capital budget does it spend?
It told Parliament it planned $8.1 billion of capital spending over 2022/23 to 2024/25 and spent $7.4 billion.
What this rests on
Capital spending (buildings, IT, equipment) against the figure in the Budget at the start of each year, over the last three years. Read it with care: departments' capital is spent under a standing authority, not a limit; the Budget-day figure is often a round or repeated amount rather than a plan; and money is routinely moved between years as projects are rescheduled. A low share can mean late projects, rescheduling or savings; a high one, money added during the year. Source: the agency's answers to its select committee.How close is its spending to its budget?
Crown entities are funded through other agencies' budgets, levies and charges, so they aren't in Treasury's appropriations data.
What this rests on
Its own running costs (staff, buildings, IT, contractors) against the figure set on Budget day, from Treasury's appropriations data. Parliament can add money during the year, so ending above the Budget-day figure is not overspending; it shows how well that figure predicted the cost.How quickly does it answer information requests?
It answered 3,502 information requests in the last year, 100% within the legal time limit (similar agencies' median: 97%). For every 1,000 requests, 4.8 ended with a complaint to the Ombudsman that the agency put right (similar agencies' median: 7.3).
What this rests on
Requests under the Official Information Act, from the Public Service Commission's statistics, and complaints about them to the Ombudsman: the one service every agency provides and reports the same way. It says little about an agency's main work.How many of its staff are leaving?
Staff numbers fell 2% in the year. The Commission publishes only staff numbers for Crown entities, so turnover and pay aren't known here.
What this rests on
The Public Service Commission's workforce data, counted the same way for every department. High turnover can mean a troubled workplace or a strong job market for its skills; restructuring shows up in staff numbers and redundancies.How things are going in its area
The results the NZ Transport Agency Waka Kotahi works towards. Many things besides the agency move them, so read these as the state of its area rather than a score for the agency alone.
Official statistics in its area
The latest figure for each, the change on a year earlier and the last eight or so years. Survey figures count as changed only when the difference is outside the survey's margin of error.
Serving the public
Requests for information
In Jan–Jun 2026 the NZ Transport Agency Waka Kotahi completed 1,811 requests under the Official Information Act, 100% within the legal time limit (usually 20 working days). 8% had their deadline extended. It published 325 of its responses.
Requests and timeliness: the Public Service Commission's six-monthly OIA statistics, which every agency reports the same way. Complaints: the Ombudsman's own six-monthly data, counted the same way for every agency.
Average days to pay suppliers' invoices: 2019/20 14.5 · 2020/21 13.3 · 2021/22 13.2 · 2022/23 13.7 · 2023/24 13.0 · 2024/25 12.7 (as it told Parliament).
Share answered on time
% of requests completed within the legal time limit, each half-year
| Half-year | Requests | On time | Extended | Average working days |
|---|---|---|---|---|
| Jan–Jun 2026 | 1,811 | 100% | 8% | 11.0 |
| Jul–Dec 2025 | 1,691 | 100% | 8% | 10.3 |
| Jan–Jun 2025 | 1,404 | 100% | 6% | 11.0 |
| Jul–Dec 2024 | 1,372 | 99% | 10% | 12.8 |
| Jan–Jun 2024 | 1,185 | 100% | 9% | 12.0 |
| Jul–Dec 2023 | 1,201 | 99% | 9% | 13.0 |
Complaints to the Ombudsman
About its handling of information requests. Remedied: the agency changed its decision, released information or apologised. Upheld: the Ombudsman found it had got it wrong. How the Ombudsman records findings has changed over time, so compare remedied cases more than upheld ones. Over the last two years: 4.8 complaints remedied for every 1,000 requests it completed.
| Half-year | Received | Completed | Remedied | Upheld |
|---|---|---|---|---|
| Jan–Jun 2026 | 26 | 23 | 11 | 0 |
| Jul–Dec 2025 | 19 | 20 | 8 | 1 |
| Jan–Jun 2025 | 7 | 15 | 7 | 0 |
| Jul–Dec 2024 | 8 | 13 | 4 | 1 |
| Jan–Jun 2024 | 11 | 21 | 8 | 3 |
| Jul–Dec 2023 | 15 | 12 | 6 | 1 |
Compared with agencies like it
The NZ Transport Agency Waka Kotahi is compared with the Crown entities here. The four largest Crown entities. They sit outside the public service, so the Public Service Commission publishes only their staff numbers.
The others: ACC, Health New Zealand – Te Whatu Ora, Kāinga Ora – Homes and Communities.
| Measure | NZ Transport Agency Waka Kotahi | Similar agencies' median | Lowest to highest, all agencies | Among similar agencies |
|---|---|---|---|---|
| Delivery | ||||
| Information requests answered on time | 100% | 97% | 4 with a figure | |
| Ombudsman complaints remedied, per 1,000 requests | 4.8 | 7.3 | 4 with a figure | |
| Size, people and costs | ||||
| Staff (FTE) | 2,764 | 3,857 | 4 with a figure | |
| Staff, change on a year earlier | −1.7% | −0.2% | 4 with a figure | |
Only measures every agency reports the same way. Places count from the highest; where fewer than six similar agencies have a figure, no place is given. A place is not a grade: for most of these (pay, staff leaving, contractors, cost per person) neither end is simply better. Capital: last three years with a capital budget of $1m or more (Treasury). Information requests: share on time over the last year (Public Service Commission). Ombudsman: complaints remedied over the last two years per 1,000 requests completed. Staff, pay and turnover: Public Service Commission (departments only for pay). Running costs and contractors' share: Treasury and PSC, latest year.
People and money
Staff
Full-time equivalents, June each year
Contractors and consultants
Every consultant and contractor it listed, 2022/23 to 2023/24
A snapshot: select committees asked every agency to list its consultants and contractors in the 2022/23 and 2023/24 annual reviews, but not since, so names are only available for those years.
1,614 engagements: 2022/23 1,100; 2023/24 514. Largest first; the 300 largest are here. People engaged as individuals aren't named. Download all 1,614 engagements (CSV)
| Year | Supplier | What for | Cost |
|---|---|---|---|
| 2023/24 | PWC Consulting NZ LP | National Ticketing Programme - support for PTA transition, as well as strategy and architectural | $4,334,318 |
| 2022/23 | PWC Consulting NZ LP | Safety Camera project - Detailed design for operating model and organisation structure (six variations signed). | $4,207,289 |
| 2022/23 | PWC Consulting NZ LP | National Ticketing Programme - Provision of customer engagement and change related activities, as well as strategy and architectural support. | $3,131,972 |
| 2023/24 | Ernst & Young Ltd | Safety Camera System programme delivery | $2,790,114 |
| 2023/24 | Ernst & Young Ltd | Safety Camera System programme delivery | $2,048,689 |
| 2022/23 | Equip GP Limited | Road Efficiency Group work programme - Provide consultancy services supporting the development of business excellence and reporting frameworks. | $1,646,291 |
| 2022/23 | Company-X-Limited | Road Efficiency Group work programme - Support the programme through IT consultancy services, developing and maintenance of the transport insight web portal. | $1,325,133 |
| 2023/24 | Equip GP Limited | Road Efficiency Group work programme - provides consultancy services supporting the development | $1,308,460 |
| 2022/23 | Deloitte | Provided the services as a resource capacity working within Waka Kotahi agile delivery model. Deloitte is currently helping develop new features and provide ongoing Digital Integration Service platform upport. | $1,263,271 |
| 2023/24 | Pricewaterhousecoopers | Writing the financial case and support for the management case of the IBC for Waitematā Harbour Connections | $1,261,121 |
| 2022/23 | Ernst & Young Ltd | Build of three interfaces between SAP and PEGA system for journal posting. | $1,195,679 |
| 2022/23 | Just Add Lime Limited | Development of the State Highway Investment Proposal, which is the Waka Kotahi investment bid to the 24-27 National Land Transport Programme. The engagement includes the development of a robust business case, development of the detailed maintenance programme using a top-down approach including facilitation, data management and analysis and the writing of the State Highway Investment Proposal documentation. The engagement was extended via variation in October 2022 to also include overall programme management and leadership. | $1,174,609 |
| 2022/23 | Deloitte | Delivered an integration/decision paper to Waka Kotahi and a five year integration roadmap. The recommendation/decision paper itemised the integration patterns in use or expected to be used at Waka Kotahi, and for each identified the options for which integration technologies can be applied, advantages/disadvantages of each, and a recommendation. | $917,761 |
| 2022/23 | Ernst & Young Ltd | Delivery partner leadership and support. | $903,116 |
| 2023/24 | Redvespa Consultants Ltd | Business Analyst services across 10 contracts. | $840,070 |
| 2023/24 | Ernst & Young Ltd | Safety Camera System programme delivery | $767,510 |
| 2022/23 | Rationale Ltd | Development of Driver Licensing Improvement Programme business case. Development of Driver Licensing Improvement Programme detailed business case. Consultancy advice to support programme (such as positioning for Ministers and Budget 2024). | $689,639 |
| 2023/24 | Rationale Ltd | Programme management support and project management. Strategic asset management and | $642,200 |
| 2023/24 | Ernst & Young Ltd | Safety Camera System programme delivery | $641,743 |
| 2023/24 | PWC Consulting NZ LP | National Ticketing Programme. | $635,883 |
| 2023/24 | Ernst & Young Ltd | Safety Camera System programme delivery | $629,608 |
| 2022/23 | Deloitte | Digital Integration Service team are building an integration engine consisting of the three boxes: Ingest, Process, and Dispatch. This will be used to translate/transform existing data sets into format that is suitable for the new templating tool for developing bulk communications. | $601,768 |
| 2023/24 | Just Add Lime Limited | Development of the SH Investment Proposal, NZTA investment bid to the 24-27 NLTP | $540,669 |
| 2022/23 | Rationale Ltd | Programme management support and project management. Strategic asset management and transport system advisory. | $446,882 |
| 2023/24 | Gorilla Consulting LTD | Support in Business Analyst, process and technology and visualization support, maintain and | $431,463 |
| 2023/24 | Ernst & Young Ltd | Configuration, testing and implementation of SAP Analytics. | $416,918 |
| 2022/23 | AoG Recuitment Panel Supplier | $411,206 | |
| 2022/23 | Out of Scope Supplier | $411,206 | |
| 2023/24 | Individual Contractor | Principal Enterprise Architect | $398,823 |
| 2022/23 | AoG Recuitment Panel Supplier | $386,972 | |
| 2022/23 | AoG Recruitment Panel Supplier | $386,972 | |
| 2023/24 | Individual Contractor | Programme Manager | $375,218 |
| 2023/24 | Ernst & Young Ltd | Blueprint refresh. | $373,566 |
| 2022/23 | 41SOUTH CONSULTING LIMITED | Lessons learnt reviews, support for phase readiness reviews. | $370,370 |
| 2023/24 | Individual Contractor | Programme Manager, Safety Cameras | $369,250 |
| 2023/24 | Individual Contractor | Lead Security Advisor - NTS | $368,461 |
| 2022/23 | AoG Recruitment Panel Supplier | $364,295 | |
| 2022/23 | AoG Recuitment Panel Supplier | $364,295 | |
| 2023/24 | Individual Contractor | Technical Lead - Technology | $358,696 |
| 2023/24 | Individual Contractor | Acting Digital Domain Lead – Transport/IoT | $354,704 |
| 2023/24 | Individual Contractor | Programme Manager | $352,016 |
| 2023/24 | Rationale Ltd | Development of DLIP Programme Business Case and DLIP Detailed Business Case. Consultancy | $350,981 |
| 2023/24 | Ernst & Young Ltd | Safety Camera System programme delivery | $349,754 |
| 2023/24 | Individual Contractor | Programme Manager | $349,382 |
| 2022/23 | Company-X-Limited | Asset Management Data Standard analysis, translation and data mapping tool sets for the transport sector. | $345,541 |
| 2022/23 | AoG Recruitment Panel Supplier | $345,177 | |
| 2022/23 | AoG Recuitment Panel Supplier | $345,177 | |
| 2022/23 | Pricewaterhousecoopers | Writing the financial case, and support the writing of the management case for the Waitematā Harbour Connections. | $344,397 |
| 2023/24 | Individual Contractor | Transition Manager | $344,272 |
| 2023/24 | Individual Contractor | Programme Manager | $340,247 |
| 2023/24 | Individual Contractor | Programme Director, Safety Camera System | $340,200 |
| 2022/23 | AoG Recuitment Panel Supplier | $339,604 | |
| 2022/23 | AoG Recruitment Panel Supplier | $339,604 | |
| 2022/23 | AoG Recuitment Panel Supplier | $339,403 | |
| 2022/23 | AoG Recruitment Panel Supplier | $339,403 | |
| 2023/24 | Individual Contractor | Manager Strategic Programmes | $338,480 |
| 2022/23 | AoG Recruitment Panel Supplier | $333,062 | |
| 2022/23 | AoG Recuitment Panel Supplier | $333,062 | |
| 2023/24 | Pricewaterhousecoopers | Internal audit - Provide co-sourced internal audit services FY24. | $332,673 |
| 2022/23 | Gorilla Consulting LTD | Services to support the implementation of capability to help with Road to Zero Speed and Infrastructure Programme planning, monitoring and reporting. | $330,100 |
| 2023/24 | Individual Contractor | Program Manager - Finance | $329,936 |
| 2022/23 | AoG Recuitment Panel Supplier | $327,168 | |
| 2022/23 | AoG Recruitment Panel Supplier | $327,168 | |
| 2022/23 | Deloitte | Providing integration services. | $327,058 |
| 2023/24 | Individual Contractor | Principal Business Analyst | $327,050 |
| 2022/23 | AoG Recruitment Panel Supplier | $326,828 | |
| 2022/23 | AoG Recuitment Panel Supplier | $326,828 | |
| 2023/24 | Individual Contractor | Senior Advisor | $320,389 |
| 2023/24 | Webstruxure Ltd | Emission Work Plan Phases 1 & 2a for the Clean Car Standard. | $320,136 |
| 2023/24 | TEAM IM NZ LP | Data Quality and transformation services. | $317,932 |
| 2022/23 | AoG Recruitment Panel Supplier | $317,536 | |
| 2022/23 | AoG Recuitment Panel Supplier | $317,536 | |
| 2023/24 | Individual Contractor | Project Manager | $316,085 |
| 2022/23 | AoG Recuitment Panel Supplier | $315,159 | |
| 2022/23 | AoG Recruitment Panel Supplier | $315,159 | |
| 2023/24 | Individual Contractor | Platform Lead | $313,760 |
| 2022/23 | AoG Recuitment Panel Supplier | $311,957 | |
| 2022/23 | AoG Recruitment Panel Supplier | $311,957 | |
| 2022/23 | AoG Recruitment Panel Supplier | $311,703 | |
| 2022/23 | AoG Recuitment Panel Supplier | $311,703 | |
| 2022/23 | AoG Recuitment Panel Supplier | $311,700 | |
| 2022/23 | AoG Recruitment Panel Supplier | $311,700 | |
| 2022/23 | TEAM Asparona New Zealand Limited | Specialist technical experience with data analysis, transformation, and dissemination. Experience and understanding of data modelling approaches, frameworks, and structures. Provide support to data architects and modellers tasked with creating the ontological models, taxonomy and data architectures including data analysis and manipulation, basic scripting, and modelling. | $311,215 |
| 2022/23 | AoG Recuitment Panel Supplier | $309,860 | |
| 2022/23 | AoG Recruitment Panel Supplier | $309,860 | |
| 2023/24 | Individual Contractor | Security Analyst | $308,656 |
| 2023/24 | Individual Contractor | Senior Program Manager - IT | $307,989 |
| 2022/23 | AoG Recuitment Panel Supplier | $307,366 | |
| 2022/23 | Satori Group New Zealand Ltd | Audit - Continuous control monitoring managed services. | $304,406 |
| 2023/24 | Individual Contractor | Policy Lead - Safety Cameras | $303,453 |
| 2023/24 | Individual Contractor | Senior Information Advisor | $303,060 |
| 2023/24 | Individual Contractor | Senior Solution Architect | $302,847 |
| 2023/24 | Individual Contractor | Programme Scheduler | $302,218 |
| 2022/23 | The Garage Business Consultants | Services to support the implementation of capability to help with Road to Zero Speed and Infrastructure Programme planning, monitoring and reporting. | $301,400 |
| 2023/24 | Individual Contractor | Project Manager - IT | $299,916 |
| 2022/23 | AoG Recuitment Panel Supplier | $299,914 | |
| 2022/23 | AoG Recruitment Panel Supplier | $299,914 | |
| 2023/24 | Individual Contractor | Senior Solution Architect | $299,044 |
| 2022/23 | AoG Recuitment Panel Supplier | $296,971 | |
| 2022/23 | AoG Recruitment Panel Supplier | $296,971 | |
| 2022/23 | AoG Recruitment Panel Supplier | $293,701 | |
| 2022/23 | AoG Recuitment Panel Supplier | $293,701 | |
| 2023/24 | Individual Contractor | PMO Lead | $291,693 |
| 2023/24 | Individual Contractor | Senior Project Manager | $291,450 |
| 2022/23 | AoG Recruitment Panel Supplier | $291,265 | |
| 2022/23 | AoG Recuitment Panel Supplier | $291,265 | |
| 2022/23 | AoG Recruitment Panel Supplier | $290,553 | |
| 2022/23 | AoG Recuitment Panel Supplier | $290,553 | |
| 2023/24 | Individual Contractor | Program Planner/Scheduler | $289,755 |
| 2023/24 | Individual Contractor | Project Manager | $289,102 |
| 2023/24 | Deloitte | Design and implementation of SAP Ariba, high level IT solution architecture | $289,044 |
| 2022/23 | AoG Recuitment Panel Supplier | $288,497 | |
| 2023/24 | Individual Contractor | Senior Solution Architect | $287,981 |
| 2022/23 | AoG Recruitment Panel Supplier | $287,071 | |
| 2022/23 | AoG Recuitment Panel Supplier | $287,071 | |
| 2022/23 | AoG Recuitment Panel Supplier | $286,688 | |
| 2022/23 | AoG Recuitment Panel Supplier | $286,077 | |
| 2022/23 | AoG Recruitment Panel Supplier | $286,077 | |
| 2022/23 | AoG Recuitment Panel Supplier | Senior Learning & Development Consultant (D) | $285,841 |
| 2022/23 | AoG Recuitment Panel Supplier | Business Owner, Clean Car Upgrade Estabishment | $285,841 |
| 2022/23 | AoG Recruitment Panel Supplier | Business Owner, Clean Car Upgrade Estabishment | $285,841 |
| 2022/23 | AoG Recruitment Panel Supplier | Senior Learning & Development Consultant (D) | $285,841 |
| 2022/23 | Ids Ltd | Analysis of the next National Land Transport Programme period using updated high speed data to determine expected network condition trends. | $285,606 |
| 2023/24 | Individual Contractor | Senior Project Manager | $285,285 |
| 2023/24 | Individual Contractor | Transfer Partner Interface Lead | $285,084 |
| 2023/24 | Individual Contractor | Programme Manager Funding and Fees | $284,164 |
| 2023/24 | Individual Contractor | Senior PM Concessions | $282,006 |
| 2022/23 | AoG Recuitment Panel Supplier | $279,863 | |
| 2022/23 | AoG Recuitment Panel Supplier | Digital Domain Lead | $279,576 |
| 2023/24 | Individual Contractor | Cloud Platform Architect | $279,487 |
| 2023/24 | Individual Contractor | Senior Project Manager | $277,621 |
| 2023/24 | Individual Contractor | Senior Systems Engineer | $277,424 |
| 2022/23 | AoG Recruitment Panel Supplier | $276,180 | |
| 2022/23 | AoG Recuitment Panel Supplier | $276,180 | |
| 2023/24 | Individual Contractor | Senior Project Manager | $275,728 |
| 2022/23 | AoG Recuitment Panel Supplier | $275,232 | |
| 2022/23 | AoG Recruitment Panel Supplier | $275,232 | |
| 2023/24 | Individual Contractor | Senior Project Manager - IT | $274,892 |
| 2022/23 | AoG Recruitment Panel Supplier | $274,769 | |
| 2022/23 | AoG Recuitment Panel Supplier | $274,769 | |
| 2022/23 | AoG Recuitment Panel Supplier | $274,724 | |
| 2022/23 | AoG Recruitment Panel Supplier | $274,724 | |
| 2022/23 | Inspire Group Limited | Provision of learning developer resources to support the development of discrete ‘training packages’ required to operationalise the Clean Car Standard, internally and with external end users. | $274,490 |
| 2022/23 | AoG Recuitment Panel Supplier | $274,195 | |
| 2022/23 | AoG Recruitment Panel Supplier | $274,195 | |
| 2023/24 | Individual Contractor | Senior Solutions Architect | $274,121 |
| 2022/23 | AoG Recuitment Panel Supplier | $273,806 | |
| 2023/24 | Individual Contractor | Senior Project Manager | $272,920 |
| 2022/23 | AoG Recuitment Panel Supplier | $272,461 | |
| 2022/23 | AoG Recruitment Panel Supplier | $272,461 | |
| 2023/24 | Individual Contractor | Senior Project Manager | $272,363 |
| 2023/24 | Individual Contractor | Commercial Specialist | $272,353 |
| 2023/24 | Individual Contractor | Change Manager | $272,206 |
| 2023/24 | Individual Contractor | Senior Architect – Cyber Security | $271,984 |
| 2022/23 | AoG Recruitment Panel Supplier | $271,552 | |
| 2022/23 | AoG Recuitment Panel Supplier | $271,552 | |
| 2023/24 | Individual Contractor | CAN Metro Services (National Ticket Solution) Programme Manager | $270,952 |
| 2023/24 | Individual Contractor | Associate Manager - Change Design | $270,535 |
| 2022/23 | AoG Recruitment Panel Supplier | $269,953 | |
| 2022/23 | AoG Recuitment Panel Supplier | $269,953 | |
| 2023/24 | Individual Contractor | Senior Business Analyst | $269,593 |
| 2022/23 | AoG Recuitment Panel Supplier | $269,459 | |
| 2022/23 | AoG Recruitment Panel Supplier | $269,459 | |
| 2022/23 | AoG Recuitment Panel Supplier | $269,349 | |
| 2022/23 | AoG Recruitment Panel Supplier | $269,349 | |
| 2023/24 | Egis NZ Limited | Provide design services for the Melling to Kennedy Good Bridge Shared Path. | $269,245 |
| 2022/23 | AoG Recruitment Panel Supplier | $269,104 | |
| 2022/23 | AoG Recuitment Panel Supplier | $269,104 | |
| 2023/24 | Individual Contractor | Senior Solution Architect | $268,879 |
| 2023/24 | Individual Contractor | Developer | $268,571 |
| 2022/23 | AoG Recuitment Panel Supplier | Senior Business Analyst | $268,554 |
| 2022/23 | AoG Recruitment Panel Supplier | Senior Business Analyst | $268,554 |
| 2022/23 | AoG Recruitment Panel Supplier | $268,516 | |
| 2022/23 | AoG Recuitment Panel Supplier | $268,516 | |
| 2023/24 | Individual Contractor | Senior Project Manager | $268,106 |
| 2022/23 | AoG Recruitment Panel Supplier | $267,484 | |
| 2022/23 | AoG Recruitment Panel Supplier | $267,484 | |
| 2022/23 | AoG Recruitment Panel Supplier | $266,680 | |
| 2022/23 | AoG Recuitment Panel Supplier | $266,680 | |
| 2023/24 | Individual Contractor | Senior Business Analyst | $265,570 |
| 2023/24 | Individual Contractor | Principal Operational Policy Analyst | $265,440 |
| 2022/23 | AoG Recuitment Panel Supplier | $264,535 | |
| 2023/24 | Individual Contractor | Scrum Master | $264,420 |
| 2022/23 | AoG Recuitment Panel Supplier | $264,140 | |
| 2022/23 | AoG Recruitment Panel Supplier | $263,989 | |
| 2022/23 | AoG Recruitment Panel Supplier | $263,989 | |
| 2023/24 | Individual Contractor | Senior Systems Engineer | $263,250 |
| 2022/23 | AoG Recruitment Panel Supplier | $262,963 | |
| 2022/23 | AoG Recuitment Panel Supplier | $262,963 | |
| 2023/24 | Individual Contractor | Senior Advisor (Official Correspondence) | $262,792 |
| 2022/23 | AoG Recuitment Panel Supplier | $262,505 | |
| 2022/23 | AoG Recuitment Panel Supplier | $261,933 | |
| 2023/24 | Individual Contractor | Change Lead | $261,504 |
| 2022/23 | AoG Recuitment Panel Supplier | $261,205 | |
| 2022/23 | AoG Recuitment Panel Supplier | $260,408 | |
| 2022/23 | AoG Recruitment Panel Supplier | $260,408 | |
| 2022/23 | AoG Recruitment Panel Supplier | $260,109 | |
| 2022/23 | AoG Recuitment Panel Supplier | $260,109 | |
| 2022/23 | AoG Recuitment Panel Supplier | $260,083 | |
| 2022/23 | AoG Recruitment Panel Supplier | $260,083 | |
| 2022/23 | 3Plus Consulting Ltd | Human Resources Information System and Payroll Business Integration services. | $260,000 |
| 2023/24 | Individual Contractor | Senior Business Analyst | $259,656 |
| 2023/24 | Individual Contractor | Principal Service Designer | $259,524 |
| 2023/24 | Individual Contractor | Senior Project Manager – Saftey Camera Programme | $259,500 |
| 2022/23 | AoG Recuitment Panel Supplier | $259,314 | |
| 2022/23 | AoG Recruitment Panel Supplier | $259,314 | |
| 2022/23 | AoG Recuitment Panel Supplier | $258,867 | |
| 2022/23 | AoG Recruitment Panel Supplier | $258,867 | |
| 2023/24 | Individual Contractor | Senior Solutions Architect | $258,855 |
| 2023/24 | Individual Contractor | Change Manager | $258,810 |
| 2022/23 | AoG Recuitment Panel Supplier | Policy Lead | $258,339 |
| 2022/23 | AoG Recruitment Panel Supplier | Policy Lead | $258,339 |
| 2022/23 | AoG Recuitment Panel Supplier | $258,152 | |
| 2022/23 | AoG Recruitment Panel Supplier | $258,152 | |
| 2022/23 | Redvespa Consultants Ltd | Consulting Stage 2 - Low emission vehicles end to end process. | $257,522 |
| 2023/24 | Individual Contractor | Senior Data Analyst | $256,940 |
| 2023/24 | Individual Contractor | Principal Service Designer | $256,693 |
| 2023/24 | Individual Contractor | Senior Business Analyst | $255,985 |
| 2022/23 | AoG Recuitment Panel Supplier | $255,214 | |
| 2022/23 | AoG Recruitment Panel Supplier | $255,214 | |
| 2023/24 | Individual Contractor | Change Manager - Change Design | $255,002 |
| 2022/23 | AoG Recuitment Panel Supplier | $254,803 | |
| 2022/23 | AoG Recruitment Panel Supplier | $254,803 | |
| 2022/23 | AoG Recuitment Panel Supplier | Senior Solutions Architect | $254,710 |
| 2022/23 | AoG Recruitment Panel Supplier | Senior Solutions Architect | $254,710 |
| 2023/24 | Individual Contractor | Senior UX/UI Designer | $254,391 |
| 2023/24 | Individual Contractor | Technical Delivery Manager / SDM | $254,186 |
| 2023/24 | Individual Contractor | Senior Business Analyst | $254,125 |
| 2022/23 | AoG Recuitment Panel Supplier | $253,762 | |
| 2022/23 | AoG Recruitment Panel Supplier | $253,762 | |
| 2022/23 | AoG Recruitment Panel Supplier | $253,646 | |
| 2022/23 | AoG Recuitment Panel Supplier | $253,646 | |
| 2022/23 | AoG Recruitment Panel Supplier | $253,343 | |
| 2022/23 | AoG Recuitment Panel Supplier | $253,343 | |
| 2022/23 | AoG Recruitment Panel Supplier | $250,274 | |
| 2022/23 | AoG Recuitment Panel Supplier | $250,274 | |
| 2022/23 | AoG Recuitment Panel Supplier | $250,100 | |
| 2022/23 | AoG Recruitment Panel Supplier | $250,100 | |
| 2022/23 | AoG Recuitment Panel Supplier | $249,972 | |
| 2022/23 | AoG Recuitment Panel Supplier | $249,600 | |
| 2022/23 | AoG Recruitment Panel Supplier | $249,600 | |
| 2023/24 | Individual Contractor | Senior Learning & Development Consultant | $249,387 |
| 2022/23 | AoG Recuitment Panel Supplier | Project Manager - MRT | $249,308 |
| 2022/23 | AoG Recruitment Panel Supplier | Project Manager - MRT | $249,308 |
| 2023/24 | Individual Contractor | BI Product Owner | $249,175 |
| 2023/24 | Individual Contractor | Senior Programme Coordinator | $249,159 |
| 2023/24 | Individual Contractor | Senior Business Anlyst | $248,820 |
| 2023/24 | Individual Contractor | Principal Advisor Māori | $248,625 |
| 2022/23 | AoG Recuitment Panel Supplier | $248,554 | |
| 2022/23 | AoG Recruitment Panel Supplier | $248,554 | |
| 2023/24 | Deloitte | Public transport commercial and procurement support for the development and implementation of the | $248,496 |
| 2022/23 | AoG Recruitment Panel Supplier | $248,474 | |
| 2022/23 | AoG Recuitment Panel Supplier | $248,474 | |
| 2022/23 | AoG Recruitment Panel Supplier | $247,907 | |
| 2022/23 | AoG Recuitment Panel Supplier | $247,907 | |
| 2022/23 | LPS | Support to set up and implement recommendations to develop an organisation-wide view, bringing all climate related activity to a single place for the organisation to access. | $247,136 |
| 2023/24 | Individual Contractor | Organisational Design & Change Lead | $247,070 |
| 2023/24 | Individual Contractor | Change Manager - Change Design | $247,000 |
| 2022/23 | AoG Recuitment Panel Supplier | $246,412 | |
| 2022/23 | AoG Recruitment Panel Supplier | $246,412 | |
| 2022/23 | Pricewaterhousecoopers | Writing the financial case, and support the writing of the management case for the Waitematā Harbour Connections. | $246,401 |
| 2023/24 | Individual Contractor | Senior Business Analyst | $246,346 |
| 2022/23 | AoG Recruitment Panel Supplier | $246,289 | |
| 2022/23 | AoG Recuitment Panel Supplier | $246,289 | |
| 2023/24 | Individual Contractor | Senior Business Analyst | $246,000 |
| 2022/23 | AoG Recruitment Panel Supplier | $245,914 | |
| 2022/23 | AoG Recuitment Panel Supplier | $245,914 | |
| 2022/23 | AoG Recruitment Panel Supplier | $245,901 | |
| 2022/23 | AoG Recuitment Panel Supplier | $245,901 | |
| 2023/24 | Individual Contractor | Senior Business Analyst | $245,123 |
| 2023/24 | Individual Contractor | Senior Project Manager | $244,912 |
| 2023/24 | Individual Contractor | Project Accountant | $244,688 |
| 2023/24 | Individual Contractor | Scrum Master | $244,400 |
| 2023/24 | Individual Contractor | Model Ops Engineer | $243,914 |
| 2022/23 | AoG Recuitment Panel Supplier | $243,906 | |
| 2022/23 | AoG Recruitment Panel Supplier | $243,906 | |
| 2023/24 | Individual Contractor | Project Advisor | $243,880 |
| 2023/24 | Individual Contractor | Senior Process Specialist | $243,780 |
| 2022/23 | AoG Recuitment Panel Supplier | $242,688 | |
| 2022/23 | AoG Recruitment Panel Supplier | $242,688 | |
| 2023/24 | Individual Contractor | Change Lead - Corporate Support | $242,435 |
| 2023/24 | Individual Contractor | Senior Business Analyst | $242,320 |
| 2022/23 | AoG Recruitment Panel Supplier | $241,931 | |
| 2022/23 | AoG Recuitment Panel Supplier | $241,931 | |
| 2022/23 | AoG Recruitment Panel Supplier | $241,786 | |
| 2022/23 | AoG Recuitment Panel Supplier | $241,786 | |
| 2022/23 | AoG Recuitment Panel Supplier | $241,611 | |
| 2023/24 | Individual Contractor | Senior Project Manager | $241,500 |
| 2023/24 | Individual Contractor | Senior Solution Architect | $241,258 |
| 2023/24 | Individual Contractor | Efficiency Analyst | $241,232 |
| 2022/23 | AoG Recruitment Panel Supplier | $240,930 | |
| 2022/23 | AoG Recuitment Panel Supplier | $240,930 | |
| 2023/24 | Individual Contractor | Change Manager | $240,135 |
| 2023/24 | Individual Contractor | Senior Architect - Cyber Security | $239,592 |
| 2022/23 | AoG Recuitment Panel Supplier | Security Service Manager | $239,058 |
| 2023/24 | Individual Contractor | Senior Project Manager | $239,053 |
| 2022/23 | AoG Recruitment Panel Supplier | $238,797 | |
| 2022/23 | AoG Recuitment Panel Supplier | $238,797 | |
| 2022/23 | AoG Recruitment Panel Supplier | $238,714 | |
| 2022/23 | AoG Recuitment Panel Supplier | $238,714 |
Contracts over $1 million
217 contracts listed, $2,573 million where values are given, most recent first. Values are whole-of-life where the agency gives them. Download all 217 contracts (CSV)
| Year | Supplier | What for | Value |
|---|---|---|---|
| 2024/25 | Fletcher Construction Infrastructure Limited and Aecom New Zealand Limited | Te Wai Takamori O Te Awa Kairangi Alliance Agreement | $743.29m |
| 2024/25 | Downer New Zealand Limited | SH1 Tirau to Waiouru Rapid Acceleration Project | $125.00m |
| 2024/25 | Acusensus Australia Pty Ltd | Statement of Work (SoW) - Establishment Phase Mobile Safety Cameras Operation | $97.00m |
| 2024/25 | WSP New Zealand Limited | Hawkes Bay Expressway Professional Services Package 1 | $43.94m |
| 2024/25 | Ventia NZ Operations Limited | Transmission Gully (TG) SH1 Project – Maintenance and Capital Works | $42.31m |
| 2024/25 | Downer New Zealand Limited | Stage 2B MCIP SH58 East of Moonshine to Transmission Gully | $41.47m |
| 2024/25 | Northern Connect - Aurecon New Zealand Limited and WSP New Zealand Limited Joint Venture | Northern Corridor Client Side Technical and Engineering Services | $40.06m |
| 2024/25 | Beca Limited | Waikare Gorge Realignment - Principal's Technical Advisor | $29.16m |
| 2024/25 | Aurecon New Zealand Limited | Belfast to Pegasus Motorway and Woodend Bypass - Pre-implementation and MSQA professional services | $21.00m |
| 2024/25 | WDM Limited | State Highways Skid Resistance and Surface Condition Survey | $16.72m |
| 2024/25 | New Zealand Post Limited | Statement of Work (SoW) - NZ Post Bulk Mail | $16.00m |
| 2024/25 | McConnell Dowell Constructors Limited and Downer New Zealand Limited Joint Venture | Westgate Station Implementation: Main Works | $14.34m |
| 2024/25 | Wood & Partners Consultants Limited | Local Road Sealed Pavement Condition Data Collection Area 2 Central North Island Area 3 Lower North Island | $13.97m |
| 2024/25 | Cubic Transportation Systems New Zealand Limited | National Ticketing Solution - SOW13 for Auckland Transport Early Integration Solution | $13.92m |
| 2024/25 | WSP New Zealand Limited | SH1WI Consenting Designer | $13.36m |
| 2024/25 | Redflex Traffic Systems Pty Ltd | Statement of Work (SoW) - Safety Camera Leasing and Operations Services | $13.00m |
| 2024/25 | Higgins Contractors Limited | Bay of Plenty (BOP) West SH29 Kaimai Asphalt Renewals 2024/25 | $12.81m |
| 2024/25 | Fulton Hogan Limited | SH57 Tararua Road Roundabout | $10.27m |
| 2024/25 | Fulton Hogan Limited | BOP West SH City & Surrounds Asphalt Renewals 2024/25 | $9.50m |
| 2024/25 | HEB Construction Limited | Paerata Roundabout Physical Works - SH22 Paerata Roundabout and Station 16 Access Road | $8.97m |
| 2024/25 | Downer New Zealand Limited | Speed and Infrastructure Programme (SIP) SH3 Holly Oak Terrace to Mangorei Road Bridge | $8.76m |
| 2024/25 | Downer New Zealand Limited | Bombay Commercial Vehicle Safety Centre (CVSC) - Phase 2 Main Works Construction | $8.36m |
| 2024/25 | Mills Albert Limited | Peka Peka to Otaki Revocations | $8.30m |
| 2024/25 | SGS New Zealand Limited | Statement of Work (SoW) Safety Camera System Calibration - BAU Services | $6.50m |
| 2024/25 | Cubic Transportation Systems New Zealand Limited | National Ticketing Solutions (NTS) - SOW 10 Transition for Regional Councils | $6.41m |
| 2024/25 | Drill Force NZ Limited | Waitemata Harbour Connections Business Case Geotechnical Drilling (Harbour) | $6.27m |
| 2024/25 | SAP New Zealand Limited | Order Form for SAP Cloud Services - Enterprise Resource Planning (ERP) Upgrade Project (14/07/2024 - 13/07/2030) | $6.19m |
| 2024/25 | Cambridge Excavators Limited | Taupo Commercial Vehicle Safety Centre (CVSC) Phase 1 | $6.08m |
| 2024/25 | Company-X Limited | Statement of Work (SoW) - Road Efficiency Group (REG) Transport Insights Development, Maintenance and Operations (1/07/2025 - 30/06/2028) | $5.55m |
| 2024/25 | Aecom New Zealand Limited | Roads of National Significance (RoNS) Mill Road Stage 1 Fast Track Approvals Process | $5.39m |
| 2024/25 | Schick Civil Construction Limited | SH05 Tirau to Tārukenga Marae Section 1.1 (Stage A & Stage B) | $5.13m |
| 2024/25 | Cambridge Excavators Limited | SH2 Wainui Road to Opotiki – Matekerepu Roundabout | $5.03m |
| 2024/25 | HEB Construction Limited | Hawke’s Bay Expressway Panel - Contractor Consulting Services | $5.00m |
| 2024/25 | Fulton Hogan Limited | Pavement Rehabilitation: Taranaki 2024/25 – 2025/26 | $4.93m |
| 2024/25 | J Swap Contractors Limited | Bay of Plenty (BOP) West State Highway Granular Pavement Renewals 2024/25 | $4.77m |
| 2024/25 | Wharehine Construction Limited | Pavement Rehabilitation: Northland Dargaville 2024/25 – 2025/26 - Contract 1 | $4.60m |
| 2024/25 | Far North Roading Limited | Maintenance & Operations Pavement Rehabilitation: SH1N Akerama and Towai Northland 2024-2025 | $4.56m |
| 2024/25 | Urban Connection Limited | SH3/SH3A Egmont Village to Hawera Safety Improvements - Southern Section Professional Services | $4.36m |
| 2024/25 | Fujitsu New Zealand Limited | Customer Systems Replacement - Microsoft Dynamics Customer Relationship Management (MS CRM) | $3.88m |
| 2024/25 | Ventia NZ Operations Limited | Lyttleton Tunnel Maintenance and Operations Physical Works | $3.75m |
| 2024/25 | Downer New Zealand Limited | Taupo Commercial Vehicle Safety Centre (CVSC) Stage 2 | $3.59m |
| 2024/25 | Beca Limited | SH3/SH3A Egmont Village to Hawera Safety Improvements - Northern Section Professional Services | $3.40m |
| 2024/25 | Arup New Zealand Limited | Northland Corridor Programme (NCP) - Transaction Support (Technical Delivery) Services | $3.26m |
| 2024/25 | Beca Limited | SH29 Omanawa Bridge Replacement: Detailed Design and Management, Surveillance, and Quality Assurance (MSQA) | $3.24m |
| 2024/25 | Rider Levett Bucknall Auckland Limited | Waitemata Harbour Crossing Parallel Estimate | $3.20m |
| 2024/25 | Unisys New Zealand Limited | Statement of Work (SoW) - Pega - Heavy Vehicle Portal Squad (December 2024 - December 2025) | $3.06m |
| 2024/25 | United Civil Construction Limited | SH14 Tangiteroria River Bridge Strengthening | $3.05m |
| 2024/25 | Fulton Hogan Limited | SH1 Bombay Interchange Signalisation | $3.05m |
| 2024/25 | Bond Construction Management Limited | Northland Corridor Programme (NCP) – Cost Services | $3.02m |
| 2024/25 | Combined Road & Traffic Services Limited | Waikato and Bay of Plenty Vegetation Control | $2.95m |
| 2024/25 | HEB Construction Limited | Waihoehoe Road Upgrade Enabling Works | $2.95m |
| 2024/25 | WSP New Zealand Limited | North Canterbury Highway Maintenance – Professional Services | $2.85m |
| 2024/25 | WSP New Zealand Limited | SH1 Wellington Improvements Investment Case | $2.69m |
| 2024/25 | Egypt Limited | Top of the South Structures Maintenance 2024-2026 | $2.67m |
| 2024/25 | Conspec Construction Limited | Region 4 Bay of Plenty Structural Maintenance 2024/25 | $2.56m |
| 2024/25 | Far North Roading Limited | Northland North West Pavement Rehabilitation 2024/25 - 25/26 | $2.52m |
| 2024/25 | HEB Construction Limited | Westgate Stations Implementation: Enabling Works | $2.42m |
| 2024/25 | Tonkin & Taylor Limited | Roads of National Significance (RoNS) Petone to Grenada - Investment Case | $2.39m |
| 2024/25 | Site Smart Solutions Limited | Ōtaki to north of Levin (Ō2NL) Project and Northern Alliance Site Office | $2.34m |
| 2024/25 | Heb Construction Limited and Fulton Hogan Limited Joint Venture | Ō2NL Northern Compound Site Office and Early Works | $2.29m |
| 2024/25 | HEB Construction Limited | SH26 Onetai Stream Bridge Replacement | $2.25m |
| 2024/25 | GHD Limited | SH1 Wellington Improvements Project Consenting Lead | $2.16m |
| 2024/25 | MS Civil Construction Limited | Central Waikato 24/25 Chipsealing Programme | $2.14m |
| 2024/25 | NGIS Australia Pty Ltd | Google Maps Core Services | $2.10m |
| 2024/25 | Beca Limited | Roads of National Significance (RoNS) East West Link - Economics Case | $2.00m |
| 2024/25 | Oxcon CLL Limited | SH1 Mangatoetoenui Bridge Superstructure Rebuild | $2.00m |
| 2024/25 | Wharehine Construction Limited | Northland Structures Maintenance 2024-2026 | $1.90m |
| 2024/25 | Construction Techniques Limited | SH1 Ngutuwera & SH29A Maungatapu Strengthening | $1.83m |
| 2024/25 | Aecom New Zealand Limited | Technical and Engineering Services for Mill Road RONS Stage 1 Investment Case | $1.77m |
| 2024/25 | WSP New Zealand Limited | Central Waikato State Highway Maintenance Professional Services 2024/25 | $1.76m |
| 2024/25 | Mainpower New Zealand Limited | NZTA State Highway 1 Kaikoura District LED Upgrade | $1.76m |
| 2024/25 | Aecom New Zealand Limited | Investment case for Roads of National Significance (RoNS) Hamilton Southern Links | $1.75m |
| 2024/25 | Corde Limited | Speed and Infrastructure Programme (SIP) Templeton to Selwyn River | $1.72m |
| 2024/25 | Cambridge Excavators Limited | SH30 Te Ngae Road – Wharenui Intersection | $1.71m |
| 2024/25 | Stantec New Zealand | Roads of National Significance (RoNS) SH6 Hope Bypass Investment Case | $1.70m |
| 2024/25 | Fulton Hogan Limited | Speed and Infrastructure Programme (SIP) Physical Works Interim Panel - Taitarakihi Culvert Replacement | $1.70m |
| 2024/25 | Armitage Group Limited | Auckland System Management (ASM) Auckland Network Optimisation (ANO) - 122x Motorway LCS 5x Tunnel CS (June 2025) | $1.56m |
| 2024/25 | Higgins Contractors Limited | SH1B Telephone Road Level Crossing Improvement | $1.52m |
| 2024/25 | Local Government New Zealand | Local Government New Zealand (LGNZ) Delivery 2024-27 | $1.50m |
| 2024/25 | WSP New Zealand Limited | SH82 End of Life Bridge Replacements – Design & MSQA - Waihao North Bridge & Elephant Hill Bridge | $1.48m |
| 2024/25 | Fulton Hogan Limited | Waima River Bridge Clip-on Cycleway | $1.42m |
| 2024/25 | Cubic Transportation Systems New Zealand Limited | Statement of Work (SoW) - SOW23 for Greater Wellington Regional Council (GW) Bus pre-wiring services | $1.38m |
| 2024/25 | Urban Connection Limited | Panel Design Works | $1.36m |
| 2024/25 | Steve Bowling Contracting Limited | SH14 Awakino River Bridge Strengthening | $1.34m |
| 2024/25 | Downer New Zealand Limited | SH29 Kaimai Ranges Tailby’s Structural Asphalt Pavement | $1.26m |
| 2024/25 | Fulton Hogan Limited | Asphaltic Surfacing - SH1, RS, 501 4140 to 4526 Wai-iti Road Approach (Trafalgar Street to Beverley Road) | $1.26m |
| 2024/25 | Volte Limited | Efficiency and Effectiveness Consultancy Support | $1.23m |
| 2024/25 | Beca Limited | SH1 Utiku Instrumentation and Monitoring & Inclined Drains Professional Services | $1.22m |
| 2024/25 | Argonaut Limited | Argonaut Transport Applications Support Services 2024-25 | $1.20m |
| 2024/25 | Axell Consultants Limited | SH29 Omanawa Bridge Replacement: Construction Contract Management Services | $1.15m |
| 2024/25 | Foster Construction Limited | Weigh Right Programme Bombay Commercial Vehicle Safety Centre (CVSC) Phase 2 - Compliance Building | $1.12m |
| 2024/25 | Fusion Networks Limited | Statement of Work (SoW) - Transmission Gully - Specialist ITS Services (March 2025) | $1.07m |
| 2024/25 | Waiotahi Contractors Limited | Bay of Plenty Emergency Works - SH35 Waikawa Culvert Remediation works | $1.07m |
| 2024/25 | Ceres New Zealand, LLC | Te Awa Kairangi / RiverLink – NZTA Demolition | $1.05m |
| 2024/25 | Mott Macdonald New Zealand Limited | Auckland Motorways Strategic Plan | $1.05m |
| 2024/25 | Fulton Hogan Limited | SH1 Dashwood Resilience Improvements | $1.01m |
| 2024/25 | GHD Limited | 2nd Ashburton River Bridge Principal Technical Advisor (2ABPTA) | $1.01m |
| 2023/24 | Cubic Transportation Systems New Zealand Limited | NTS Cubic Statement of Work 11 (Operations Services): National Ticketing Solution ongoing operations services for all Public Transport Authorities | $150.00m |
| 2023/24 | Downer New Zealand Limited | SH29 Tauriko West Enabling Works: Upgrades to improve safety at SH29 intersections and enable development within Tauriko West | $143.93m |
| 2023/24 | Downer New Zealand Limited | NZUP SH1/29 Intersection Improvement: Construction of a new SH1/29 two-lane roundabout at Piarere | $44.79m |
| 2023/24 | Fulton Hogan Limited | NZUP SH75 Halswell Rd Improvements: Addition of two bus lanes along SH75 through Halswell and intersection improvements | $42.67m |
| 2023/24 | McConnell Dowell Constructors Limited | SH25a Taparahi Slip Remediation Physical Works: Remediate the section of SH25a lost to a slip (Taparahi Slip) with a bridge | $40.00m |
| 2023/24 | Downer New Zealand Limited | Weigh Right Programme Ohakea and Mackays Projects Physical Works: Construction of new Commercial Vehicle Safety Centres | $20.28m |
| 2023/24 | National Transport Research Organisation (NTRO) (Formerly ARRB) | State Highway Pavement Survey 2024: Next generation pavement survey planning and annual subsurface pavement survey of the State Highway network | $18.01m |
| 2023/24 | Fulton Hogan Limited | SH1 Brynderwyn Hills Project Works: Emergency Works to repair January to February 2023 cyclone damage as part of the Northland Recovery Delivery Project | $15.00m |
| 2023/24 | Downer New Zealand Limited | Homer Tunnel Avalanche Shelter Physical Works: Construction of a replacement avalanche shelter at the east entrance to the Homer Tunnel on SH94 | $14.19m |
| 2023/24 | Geosolve Limited | Local Road Sealed Pavement Condition Data Collection - Area 1 Upper North Island and Area 4 South Island: Sealed pavement condition data collection services for road controlling authorities | $10.36m |
| 2023/24 | Beca Limited | SH1 Rolleston Access Improvements Pre-Implementation and Implementation: Professional services during pre-implementation and MSQA implementation phases | $10.24m |
| 2023/24 | Wharehine Construction Limited | Dome Valley Package Northland Emergency Works: Implementation of emergency recovery works on the corridor | $10.00m |
| 2023/24 | Westpac New Zealand Limited | All of Government Banking Services: Banking services for NZTA | $7.00m |
| 2023/24 | AECOM New Zealand Limited, Jacobs New Zealand Limited and Mott MacDonald New Zealand Limited Joint Venture | Westgate Station & Brigham Creek Station: Pre-implementation design services for new bus station | $6.38m |
| 2023/24 | Jacobs New Zealand Limited | NZUP SH22 Urbanisation Pre-Implementation Stage 2B and SQA Professional Services: Pre-implementation services (Stage 2) and surveillance and quality assurance services during implementation | $5.84m |
| 2023/24 | Tupore Infrastructure Limited | SH1 East Taupo Arterial Stage 3 Median Barrier: Pavement widening, road side barrier, continuous median barrier, minor drainage works, road marking and signage | $5.76m |
| 2023/24 | Splice Construction Limited | SIP LCLR - Waikato and Bay of Plenty: Long Life Pavement Marking, Signs and Safety Barrier: ATP pavement marking, pavement widening and side safety barriers | $5.42m |
| 2023/24 | Downer New Zealand Limited | SH1 Ōtaki to north of Levin (Ō2NL) Northern (South of Foxton Section): CNI Speed Infrastructure Programme Physical Works - SH1 Levin to Foxton - Section 1 Foxton | $4.64m |
| 2023/24 | Fulton Hogan Limited | SH6 Blenheim to Woodbourne Safety Improvements - Bells/ St Leonards Roundabout: Construction of two new roundabouts at SH6/Bells Road and SH6/Tancred Crescent | $3.50m |
| 2023/24 | PricewaterhouseCoopers | National Ticketing Solution Consultancy Services Order (Programme Support from August to January 2024): Business enablement, customer support, change management including marketing, plan and schedule and other capability | $3.15m |
| 2023/24 | Whitestone Contracting Limited | SH1 Kakanui Flood Mitigation: Construction of a new culvert bridging structure and raising of approximately 350m carriageway | $3.02m |
| 2023/24 | Rider Levett Bucknall Wellington Limited | Ōtaki to north of Levin (Ō2NL) Lead Independent Estimator (IE): Procure the services of a Lead IE for the project (excluding QS services) | $3.00m |
| 2023/24 | Exabeam (reseller Datacom) | Exabeam EULA 9831 Enterprise Licence: Exabeam SIEM for security monitoring, premier support and training | $2.92m |
| 2023/24 | Downer New Zealand Limited | SIP Low Cost Low Risk (LCLR) - Manawatu Long Life Pavement Marking, Signs and Safety Barrier: Audio-tactile profiled pavement marking, pavement widening and side safety barriers | $2.75m |
| 2023/24 | Inov8 Limited | Inov8 MP Statement of Work (SoW) Enterprise SLA Applications Support 1 July 2024 to 30 June 2026: Software support services for software applications | $2.67m |
| 2023/24 | Egypt Limited | Bridge 256 Replacement: Waihopai Valley Road - Maori Ford Bridge Replacement | $2.54m |
| 2023/24 | Stellar Projects Limited | Speed Infrastructure Programme (SIP) SH1 Piarere to Taupo (Section A and B) Detailed Design: Detailed design of the installation of the median barriers and associated work between the SH1/SH29 intersection and Tirau | $2.45m |
| 2023/24 | Ernst & Young Limited | Consultancy Services Order (CSO) #4 - Safety Camera Systems Programme: Fourth CSO as part of Ernst & Young's role as Delivery Partner for the SCS Programme | $2.41m |
| 2023/24 | Unisys New Zealand Limited | Project Statement of Work - Pegasystems Software Applications for Clean Car Standard Releases to 31 Oct 2023: Additional releases post the go-live date | $2.34m |
| 2023/24 | Downer New Zealand Limited | SH1 Whangarei to Wellsford (W2W) Northern Interim Safety Improvements: Safety improvements on SH1 from Springfield to Port Marsden Highway | $2.11m |
| 2023/24 | Total Barrier Solutions Limited | SH3 Whanganui to Bulls: T2B Section Median Barrier: Installation of approximately 4km of wire rope median barrier between Turakina and Bulls | $1.96m |
| 2023/24 | Southern Reap Incorporated | CRSF - Southern REAP: Community Road Safety Fund partnership to deliver community driver training programme (Drive My Life) in Southland | $1.90m |
| 2023/24 | AECOM New Zealand Limited | SH1 Northbound Silverdale Bus Priority Lane Detailed Design: Detailed design and contract administration for the Silverdale bus priority lane project | $1.73m |
| 2023/24 | CONVIC Pty Limited | Te Awa Kairangi Skate Park: Construction of the new skatepark for the RoRS SH2 Melling project | $1.69m |
| 2023/24 | Fulton Hogan Limited | SH34 Tarawera River Bridge Walkway and Barrier Replacement Physical Works: Replacement of Walkway and barrier | $1.68m |
| 2023/24 | Fulton Hogan Limited | Waikato Wider Network Signage Physical Works (P3+5): Renovate destination signage affected by the Waikato Expressway Hamilton section | $1.59m |
| 2023/24 | Ipsos Limited | Education and Marketing Customer Tracking Research: Research services to understand target audiences and inform education and marketing approaches | $1.50m |
| 2023/24 | Stantec New Zealand | SH1 Dunedin City and Hospital Single Stage Business Case: Professional services to develop the SH1 Dunedin City and Hospital Single Stage Business Case | $1.46m |
| 2023/24 | Environs Holdings Limited | Brynderwyns North - Northern Recovery and Resilience Delivery Program - Te Uri o Hau: Professional services for cultural advice and cultural monitoring for Brynderwyn Hills works plans | $1.45m |
| 2023/24 | Hunter Civil Limited | SH73 Mc Grath Creek Bridge Superstructure Replacement: Replacement of the SH73 McGrath Creek Bridge superstructure and associated works | $1.41m |
| 2023/24 | Agfirst Consultants Environmental Limited | State Highway Traffic Monitoring - Central North Island: Traffic counting for the Manawatu-Whanganui and Taranaki network outcomes contract regions | $1.40m |
| 2023/24 | Traffic Control Systems Limited | Tram Road Off Ramp Signals: Traffic signals on SH1 northbound offramp for right turns onto Tram Road | $1.37m |
| 2023/24 | TruckSafe New Zealand Limited | Acceleration of the Implementation of TruckSafe New Zealand - Haumara Taraka o Aotearoa: Release funding to accelerate implementation of the TruckSafe heavy vehicle accreditation scheme | $1.33m |
| 2023/24 | Stantec New Zealand | SH1/29 Intersection Upgrade - Professional Services MSQA: Monitoring, surveillance, and management during construction | $1.31m |
| 2023/24 | Tonkin & Taylor Limited | Te Oreore Permanent Works Design: Detailed design and implementation design support for slip stabilisation and road re-alignment at Te Oreore slip site on SH4 | $1.26m |
| 2023/24 | MS Civil Construction Limited | SH3 MacLaughlan's Corner Retaining Wall and Culvert: Construction of a tie-back retaining wall and a new culvert crossing the highway | $1.24m |
| 2023/24 | MGI Auckland Assurance Limited | Te Ara o Te Ata Mount Messenger Bypass - External Alliance Auditor: Ensure the Other Alliance Partners are reimbursed for actual costs incurred in providing the services | $1.23m |
| 2023/24 | Conspec Construction Limited | SH25 Waitakaruru Bridge Re-decking Physical Works: Remove the old wooden deck and put on a new wooden replacement | $1.21m |
| 2023/24 | MS Civil Construction Limited | SH31 Harbour Road Kawhia and SH3 Te Kuiti BP Slip - Emergency Works: Repair slips after Auckland Anniversary weekend | $1.20m |
| 2023/24 | Ernst & Young Limited | Consultancy Services Order (CSO) #5 - Safety Camera Systems (SCS) Programme: The 5th CSO as part of EY's role as Delivery Partner for the SCS Programme | $1.20m |
| 2023/24 | Downer New Zealand Limited | SH3 Egmont Village to Hawera Accelerated Works: Safety and rehabilitative improvements to SH3, Egmont Village to Hawera | $1.17m |
| 2023/24 | Youth Inspire | Community Road Safety Fund (CRSF) - Youth Inspire 2023-2026: CRSF partnership to deliver a driver mentoring programme in the Hutt Valley | $1.15m |
| 2023/24 | Schick Civil Construction Limited | SH75 Hilltop Road Safety Barrier: LCLR safety improvement project to install side barrier on Hilltop section of SH75 | $1.14m |
| 2023/24 | Cubic Transportation Systems New Zealand Limited | National Ticketing Solution Statement of Work (SoW) 4 (Greater Wellington Design): Design elaboration for the transition of Greater Wellington Regional Council | $1.12m |
| 2023/24 | J Swap Contractors Limited | Waikato Wider Network Signage Physical Works (P1+5): Waikato Expressway - renovate the existing destination signage affected | $1.06m |
| 2023/24 | Ruapotaka Marae Society Incorporated | CRSF - Ruapōtaka Marae: CRSF funded driver training programme partnership | $1.03m |
| 2023/24 | WSP Limited | Dome Valley Package Northland Emergency Works: Design services for the implementation of emergency recovery works on the corridor | $1.00m |
| 2022/23 | McConnell Dowell Constructors Limited and Fulton Hogan Limited Joint Venture | SH25A Taparahi Slip Remediation | $43.00m |
| 2022/23 | Fulton Hogan Limited | SH16 Brigham Creek to Waimauku - Stage 1 | $37.38m |
| 2022/23 | Oxcon CLL Limited | SH1 Loop Road to Smeatons Hill Safety Improvements | $27.76m |
| 2022/23 | WSP New Zealand Limited, Beca Limited, COX Architecture PTY Limited and SYSTRA Scott Lister Australia PTY Limited | Additional Waitemata Harbour Connections (Professional Services) Alliance - Alliance Agreement | $27.75m |
| 2022/23 | Fletcher Construction Infrastructure Limited and AECOM New Zealand Limited | RiverLink Interim Project Alliance Agreement | $18.80m |
| 2022/23 | Microsoft New Zealand Limited | Volume Licencing - Azure three-year commitment | $16.52m |
| 2022/23 | Downer New Zealand Limited | SH58 Safety Improvements, Stage 2B - Harris Road to East of Moonshine Road | $16.15m |
| 2022/23 | Fulton Hogan Limited | SH3 Te Ara Tutohu: Waitara to Bell Block Safety Improvements - Princess Street Roundabout Implementation | $14.83m |
| 2022/23 | CLL Service & Solutions Limited | SH1 Mangamuka Slips and Rehabilitation (Emergency Response) - Physical Works | $13.10m |
| 2022/23 | Inframax Construction Limited | SH43 Forgotten World Highway - Tangarakau Gorge Seal Extension Stage 2 | $11.42m |
| 2022/23 | Downer New Zealand Limited | Otaki River to Taylors Road Shared Path | $11.07m |
| 2022/23 | Fulton Hogan Limited | SH1 Bulls to Sanson Pukenui Road Intersection | $9.75m |
| 2022/23 | Downer New Zealand Limited | SH1 Otaki to Levin Safety Improvements | $8.50m |
| 2022/23 | Fujitsu New Zealand Limited | ITMS Marketplace Statement of Work 6 - Service Aggregation | $7.90m |
| 2022/23 | WDM Limited | State Highway Automated Data Collection 2022-2025 | $6.20m |
| 2022/23 | Hiway Stabilizers New Zealand Limited | Gisborne Emergency Works Foam Bitumen Stabilisation | $6.00m |
| 2022/23 | One New Zealand Group Limited (formerly Vodafone New Zealand Limited) | Data Centre Switching Hardware - Statement of Work | $5.84m |
| 2022/23 | One New Zealand Group Limited (formerly Vodafone New Zealand Limited) | Intelligent Transport Systems (ITS) Network - Network Test Environment (NTE) - Statement of Work | $5.82m |
| 2022/23 | Emmetts Civil Construction Limited | SH43 Kahouri Stream Bridge Replacement | $5.62m |
| 2022/23 | Fulton Hogan Limited | SH6/84 Mt Iron Wanaka Roundabout | $5.15m |
| 2022/23 | Fujitsu New Zealand Limited | ITMS Marketplace Statement of Work 3 - Server Management and Administration | $4.99m |
| 2022/23 | Fulton Hogan Limited | NZUP Tinwald Corridor Improvements | $4.82m |
| 2022/23 | GHD Limited | NZUP Waihoehoe Road Upgrade : Pre-Implementation Services Stage 2B | $4.77m |
| 2022/23 | GHD Limited | NZUP Brougham Street - Pre-implementation and Implementation | $4.60m |
| 2022/23 | Bike on New Zealand Charitable Trust | Bikes in Schools | $4.57m |
| 2022/23 | Downer New Zealand Limited | SH1 Cobham Drive / Cambridge Road Intersection Upgrade | $4.42m |
| 2022/23 | WSP New Zealand Limited | Asset Management Data Standard - Multi Modal Network Model | $3.60m |
| 2022/23 | SADD Aotearoa - Students Against Dangerous Driving Charitable Trust | CRSF - Students Against Dangerous Driving (2022-2027) | $3.19m |
| 2022/23 | Cross Construction Limited | SH2 Wainui to Opotiki Section 1B and 1C Safety Improvements | $3.17m |
| 2022/23 | Downer New Zealand Limited | Porirua to Johnsonville - Stage 3 | $3.08m |
| 2022/23 | National Transport Research Organisation Limited (formerly ARRB Group Ltd) | Waka Kotahi iPAVe Agreement | $2.88m |
| 2022/23 | Jacobs New Zealand Limited | SIP SH1 Timaru to St Andrews - Professional Services | $2.82m |
| 2022/23 | Unisys New Zealand Limited | Pegasystems Software Applications - Clean Car Standard Releases to 1 Jun 23 - Project Statement of Work | $2.63m |
| 2022/23 | Fujitsu New Zealand Limited | ITMS Marketplace Statement of Work 4 - Service Management Services | $2.54m |
| 2022/23 | The Salvation Army New Zealand Trust | CRSF Salvation Army Driver Training | $2.38m |
| 2022/23 | Higgins Contractors Limited | SH2 Whakatiki Street to Fergusson Drive - Safety Improvements | $2.28m |
| 2022/23 | Aurecon New Zealand Limited | NZUP SH 75 Halswell Road Improvements Pre-Implementation and MSQA Professional Services | $2.21m |
| 2022/23 | Wharehine Construction Limited | SH1 Whangarei to Wellsford (W2W) Central Safety Improvements - Packages 1 and 2 Stage 1 Wide Median Installation | $2.15m |
| 2022/23 | National Transport Research Organisation Limited (formerly ARRB Group Ltd) | Agreement for Research Consultancy Services | $2.00m |
| 2022/23 | Conspec Construction Limited | Region 3 & 4 Structural Maintenance 2022/23 Package 1 | $1.84m |
| 2022/23 | Ernst & Young Limited | Safety Camera System Delivery Partner Consultant Service Order 2 | $1.84m |
| 2022/23 | United Civil Construction Limited | SH10 Parapara Bridge Strengthening | $1.82m |
| 2022/23 | Geostabilization New Zealand Limited | SH1 Desert Road Emergency Works | $1.71m |
| 2022/23 | SmartComms Pty Limited | Smart Communications - Order Form - Enterprise Bulk Communications | $1.71m |
| 2022/23 | HEB Construction Limited | SH3 Glenview Bus Hub | $1.64m |
| 2022/23 | Splice Construction Limited | Region 3 and 4 Sour Protection 2022/23 | $1.50m |
| 2022/23 | Downer New Zealand Limited, Fulton Hogan Limited and Higgins Contractors Limited | Cyclone Gabrielle East Coast Recovery Interim Programme Alliance Agreement | $1.50m |
| 2022/23 | Deloitte Limited | Integration Platform Support - Statement of Work | $1.48m |
| 2022/23 | Conspec Construction Limited | SH3 Mangapiko and SH39 Mangati Bridge Strengthening | $1.45m |
| 2022/23 | Maxbuild Limited | Region 3 and 4 Structural Maintenance 2022/23 - Package 2 | $1.45m |
| 2022/23 | Sparrow Construction Limited | Smisek Site Development and Te Horo Station Building Restorations | $1.33m |
| 2022/23 | Unisys New Zealand Limited | Pegasystems Software Applications Heavy Vehicle Permitting MLP4 - Project Statement of Work | $1.32m |
| 2022/23 | Fulton Hogan Limited | SH1 Whangarei to Wellsford (Southern Section) Safety Improvements Project 3 and Project 6 | $1.31m |
| 2022/23 | Deloitte Limited | Digital Integration Service Platform Resourcing - Statement of Work | $1.29m |
| 2022/23 | Kirikiriroa Marae Incorporated | RSF Kirikiriroa Marae Driver Training | $1.29m |
| 2022/23 | Unisys New Zealand Limited | Pegasystems Software Applications Regulatory Tools - Statement of Work (No. 1) | $1.29m |
| 2022/23 | J Swap Contractors Limited | SH1 Cambridge to Piarere Stage 3 Hydro Road Turnaround | $1.16m |
| 2022/23 | Steve Bowling Contracting Limited | SH10 Waitangi River Bridge Strengthening | $1.16m |
| 2022/23 | Pricewaterhousecoopers Consulting (New Zealand) LP | NTS Programme Support | $1.13m |
| 2022/23 | Far North R.E.A.P Society Incorporated | CRSF Far North REAP Driver Training | $1.07m |
| 2022/23 | CSL Infrastructure Limited | Order Form - VSL Panel - Auckland System Management (ASM) - electronic signs | $1.00m |
| 2022/23 | Mahi Tahi Media Limited | National Road Safety Promotional Programme - Advertising Services Order | $1.00m |
| 2022/23 | WSP New Zealand Limited | SH1 Brynderwyn Hills Design Services | $1.00m |
Bought without competition
Purchases over $100,000 not put out to competitive tender, with the reason given, largest first. Download all 81 purchases (CSV)
| Supplier | What for | Why no competition | Amount |
|---|---|---|---|
| – | SH1 Tirau to Waiouru Rapid Acceleration Project | Unsolicited unique proposal | $125,000,000 |
| – | Hawkes Bay Expressway Professional Services Package 1 | Following an open competitive process | $43,937,250 |
| – | Stage 2B MCIP SH58 East of Moonshine to Transmission Gully | Exceptionally advantageous conditions | $41,469,992 |
| – | SH1WI Consenting Designer | Additional goods, services or works | $13,356,865 |
| – | Statement of Work (SoW) - Safety Camera Leasing and Operations Services | Additional goods, services or works | $13,000,000 |
| – | Peka Peka to Ōtaki Revocations | Purchasing a prototype for research, experiment, study or original development. | $8,300,000 |
| – | Statement of Work (SoW) Safety Camera System Calibration - BAU Services | Additional goods, services or works | $6,500,000 |
| – | Roads of National Significance (RoNS) Mill Road Stage 1 Fast Track Approvals Process | Exceptionally advantageous conditions | $5,387,340 |
| – | Hawke’s Bay Expressway Panel - Contractor Consulting Services | Following an open competitive process | $5,000,000 |
| – | Bay of Plenty West State Highway Granular Pavement Renewals 2024/25 | Unsolicited unique proposal | $4,773,360 |
| Local Government New Zealand | Local Government New Zealand (LGNZ) Delivery 2024-27 | Only one supplier | $4,500,000 |
| – | Lyttleton Tunnel Maintenance and Operations Physical Works | Unsolicited unique proposal | $3,752,211 |
| – | SH14 Tangiteroria River Bridge Strengthening | Exceptionally advantageous conditions | $3,054,825 |
| – | Waikato and Bay of Plenty Vegetation Control | Only one supplier | $2,954,724 |
| – | North Canterbury Highway Maintenance – Professional Services | Unsolicited unique proposal | $2,850,000 |
| – | Waitemata Harbour Crossing Parallel Estimate | Additional goods, services or works | $2,804,490 |
| – | Ō2NL Project and Northern Alliance Site Office | Exceptionally advantageous conditions | $2,337,000 |
| – | Ō2NL Northern Compound Site Office and Early Works | Exceptionally advantageous conditions | $2,289,950 |
| – | SH1 Wellington Improvements Project Consenting Lead | Additional goods, services or works | $2,157,085 |
| – | RoNS East West Link - Economics Case | Additional goods, services or works | $2,000,000 |
| – | SH1 Ngutuwera & SH29A Maungatapu Strengthening | Only one supplier | $1,833,691 |
| – | Technical and Engineering Services for Mill Road RoNS Stage 1 Investment Case | Exceptionally advantageous conditions | $1,773,488 |
| – | Central Waikato State Highway Maintenance Professional Services 2024/25 | Only one supplier | $1,763,570 |
| – | NZTA State Highway 1 Kaikoura District LED Upgrade | Only one supplier | $1,763,301 |
| – | SH82 End of Life Bridge Replacements – Design & MSQA - Waihao North Bridge & Elephant Hill Bridge | Following an open competitive process | $1,475,902 |
| – | Waima River Bridge Clip-on Cycleway | Exceptionally advantageous conditions | $1,424,694 |
| – | SH14 Awakino River Bridge Strengthening | Emergency | $1,339,291 |
| – | SH29 Kaimai Ranges Tailby’s Structural Asphalt Pavement | Exceptionally advantageous conditions | $1,261,172 |
| – | SH1 Utiku Instrumentation and Monitoring & Inclined Drains Professional Services | Additional goods, services or works | $1,223,245 |
| – | Bay of Plenty Emergency Works - SH35 Waikawa Culvert Remediation works | Emergency | $1,065,493 |
| – | Te Awa Kairangi / RiverLink – NZTA Demolition | Following an open competitive process | $1,054,000 |
| – | External Audit Services | Only one supplier | $682,000 |
| – | Long Lead Material cost only for Luminaries and Streetlight Columns for NZTA State Highway 1 Kaikoura District LED | Only one supplier | $603,326 |
| Te Manawaroa Limited Partnership | Te Manawaroa Limited Partnership - Phase 1 - Ō2NL Project | Only one supplier | $549,600 |
| – | Peka Peka to Ōtaki (PP2Ō) - Clifden Cottage Restoration | Only one supplier | $519,801 |
| Zeal Advisory Ltd | Waitemata Harbour Connections (WHC) - OIM Support (Zeal Advisory Ltd) | Additional goods, services or works | $500,000 |
| – | Tauriko West Project Management Services | Exceptionally advantageous conditions | $500,000 |
| – | Engineer to Contract for Bailey bridge services | Only one supplier | $500,000 |
| – | Ashburton Second Bridge - Professional Services | Additional goods, services or works | $498,714 |
| – | Petone to Grenada Investment Case - Transport Planning Lead Support and Modelling Analysis | Additional goods, services or works | $455,680 |
| Kiok Advisory | Northland Corridor Section 1 Steering Committee - Kiok Advisory | Only one supplier | $450,000 |
| JJM Advisory | Northland Corridor Section 1 Steering Committee - JJM Advisory | Only one supplier | $450,000 |
| Kahanui Ventures | Independent governance and advisory services to Transport Services - Kahanui Ventures | Only one supplier | $450,000 |
| Cameron Fauvel Projects | Drury Southbound Ramp Closure Mitigation - Detailed Design (Cameron Fauvel Projects) | Emergency | $430,885 |
| – | Tararua Arapaepae Roundabout MSQA - MCIP Ōtaki to north of Levin (Ō2NL) Project | Exceptionally advantageous conditions | $426,240 |
| – | Integrated Delivery Model (IDM) Programme - Advisory services | Additional goods, services or works | $375,000 |
| – | RoNS Mill Road Stage 1 Pre-Implementation Phase iwi partnership and engagement service | Exceptionally advantageous conditions | $330,000 |
| – | Professional Services - Melling Transport Improvements – Owner Interface Manager | Exceptionally advantageous conditions | $320,000 |
| – | SH41 R- Waihi Hill Scour + SH41 Waihi Hill Hipaua Steaming Cliffs Slip | Additional goods, services or works | $312,859 |
| – | ADSL-0127 - Project Management within Manawatū and Taranaki | Additional goods, services or works | $310,905 |
| – | SH1 Tirau to Taupo Professional Services Management, Surveillance, Quality, and Assurance (MSQA) - CWNOC Accelerated works | Unsolicited unique proposal | $300,000 |
| – | SH1 Northern Gateway Toll Road – design and MSQA services to enable a 110km/h speed limit | Additional goods, services or works | $300,000 |
| – | RoNS Mill Road Stage 1 Design Phase Principal Project Manager support | Exceptionally advantageous conditions | $296,100 |
| – | Hawke’s Bay Expressway (HBX) Stage 1 Geotech Investigations | Following an open competitive process | $289,120 |
| – | National Transport Research Organisation (NTRO) Project AI – Stage 2 Trial | Only one supplier | $277,000 |
| Resolve Group | Green Based Solutions Trial Implementation (Resolve Group) | Only one supplier | $273,730 |
| – | Category 1 Structures Peer Review - MCIP Ō2NL Project | Exceptionally advantageous conditions | $270,000 |
| – | Bikes in Schools - support for pipeline and implemented schools | Only one supplier | $260,000 |
| Frequency | North West Rapid Transit (NWRT) Secondment (Frequency) | Exceptionally advantageous conditions | $247,300 |
| – | Te Ara Tupua - Project Support | Additional goods, services or works | $240,400 |
| – | Transforming Project Development - Decision-led approach | Only one supplier | $239,000 |
| – | State Highway Valuation 2025 | Only one supplier | $234,000 |
| – | Papakura to Drury (P2D) - Papakura to Drury (P2D) Restoration Plan & Engagement + Partnership Scope of Services (Kakano) | Only one supplier | $230,644 |
| – | Road of National Significance (RoNS) SH1 Wellington Improvements Parallel Estimation Services | Exceptionally advantageous conditions | $228,000 |
| – | SH76 Christchurch Southern Motorway 110 Implementation | Additional goods, services or works | $224,400 |
| Fulton Hogan | Fulton Hogan Government Model Contract (GMC) Network Audit Services | Exceptionally advantageous conditions | $221,500 |
| – | Practice Lead for Central North Island (CNI) Region | Exceptionally advantageous conditions | $215,936 |
| – | SH1 Ocean Beach, Bluff Pre-Implementation | Exceptionally advantageous conditions | $213,650 |
| – | Client-Side Network Management Support | Exceptionally advantageous conditions | $200,720 |
| – | Relocation - 10279236 - 404 Holland Road, Puketaha | Only one supplier | $200,660 |
| Kerridge & Partners | Kerridge & Partners | Only one supplier | $120,000 |
| Vertiv | Vertiv - Replacement HVAC Blower Units | Only one supplier | $120,000 |
| resource management technology group limited | CSVUE - Software licencing agreement - resource management technology group limited | Exceptionally advantageous conditions | $117,400 |
| Downer | Downer GMC 11157 ITSN TRANSFORMATION | Additional goods, services or works | $111,702 |
| – | Japan Border Inspection Auditing | Only one supplier | $110,000 |
| – | System & Safety Performance Team – Function Clarity Review | Following an open competitive process | $110,000 |
| Unisys | Unisys SoW 10774 Enterprise API Development Services | Additional goods, services or works | $109,514 |
| – | Westgate Mahi Toi Station Design | Additional goods, services or works | $105,000 |
| Fusion | Fusion - SoW - AHB Exit - WAN Migration (July 2024) | Additional goods, services or works | $103,313 |
| One NZ | National Ticketing Solution (NTS) - One NZ - SoW (MotuMove Network Discovery) | Additional goods, services or works | $102,300 |
| Chase Commercial | Chase Commercial - Real Estate Agreement | Additional goods, services or works | $100,000 |
How it is run
From the NZ Transport Agency Waka Kotahi's written answers to its select committee before each annual review (2022/23, 2023/24, 2024/25). Agencies answer on their own basis, so compare them over time rather than with other agencies.
Redundancies, perks and cuts
What the agency told its committee in each review about the year under review (counts such as Koru Club memberships and NDAs are as at the date the question gave). Committees ask different questions each year, so gaps often mean the question wasn't asked.
| 2022/23 review | 2023/24 review | 2024/25 review | |
|---|---|---|---|
| Invoices paid late (%) | 22 | 19 | – |
| Invoices paid late | 13,690 | 11,511 | – |
| Invoices | 61,171 | 59,981 | – |
| Redundancy payments | 28 | – | 70 |
| Redundancy paid | $1,441,306 | – | $3,729,338 |
| Koru Club memberships | 74 | 31 | 26 |
| Koru Club cost | – | $15,409 | – |
| Leadership air travel | – | $101,713 | $167,433 |
| Purchase cards | – | 735 | – |
| Non-disclosure agreements in place | – | 1 | – |
| Personal grievances | – | – | 10 |
| Protected disclosures | – | – | 9 |
| Roles cut 1 July 2024 to 30 June 2025 | – | – | 564 |
| Vacant positions removed 1 July 2024 to 30 June 2025; since 27 November 2023 | – | 480 | 339 |
| Change processes 1 July 2024 to 30 June 2025; since 27 November 2023 | – | 14 | 12 |
| Voluntary redundancy processes since 27 November 2023 | – | 0 | – |
| Redundancy processes since 27 November 2023 | – | 0 | – |
| Savings identified | – | $14,000,000 | – |
Gifts and hospitality accepted
123 items on its registers, highest-valued first; values are the agency's estimates. Years are financial years (July to June). Download all 123 register entries (CSV)
| Date | Gift or hospitality | From | Value |
|---|---|---|---|
| 27 Nov 2023 | Attendance at the 2024 National Academy of Sciences Transportation Research Board (TRB) Annual Meeting in Washington, D.C. | US Department of Transportation (DOT) Federal Highway Administration (FHWA). | $3,650 |
| 16 Aug 2024 | Tickets to Building Nations 2024 | Aurecon | $2,469 |
| 2 Aug 2022 | Ticket to the NZ Bridge Summit and Awards Dinner Evening | Beca | $2,089 |
| 17 Apr 2023 | Registration, flights and accommodation to 2023 NZPI Conference | EQC and NZPI | $1,900 |
| 18 Apr 2024 | Ticket to a conference | Brightstar for Risk NZ | $1,436 |
| 17 Jun 2024 | Ticket to a conference | ITS New Zealand | $1,294 |
| 17 Jun 2024 | Ticket to a conference | ITS New Zealand | $1,294 |
| 10 Jun 2024 | Ticket to a conference. | ITS New Zealand | $1,294 |
| 31 May 2024 | Ticket to a conference | ITS New Zealand | $1,294 |
| 29 May 2024 | Ticket to a conference | ITS New Zealand | $1,294 |
| 18 Mar 2024 | Ticket to a conference | ITS Australia | $1,200 |
| 21 Oct 2024 | Conference | Corinium Global Intelligence | $1,000 |
| 29 Jul 2024 | 3 x Double Passes to Synthony Pride at Spark Arena as part of NZTA Pride Network | Burnett Foundation | $900 |
| 24 Jan 2024 | Ticket to a conference | RIMS | $900 |
| 22 Jan 2024 | Ticket to a conference | RIMS event organiser | $900 |
| 28 Nov 2023 | Random prize draw of 2 nights accommodation at Sofitel Auckland | Sofitel & Auckland Convention Bureau | $900 |
| 19 Jan 2024 | Ticket to a conference | Risk Management Society | $855 |
| 2 Apr 2025 | Event attendance and Dinner | Atomic.io | $395 |
| 11 Jun 2025 | Prize Draw | Woods (Geospatial Company) | $350 |
| 19 Oct 2022 | Complimentary ticket to 2022 SAS Users Conference (SUNZ-22) | SAS | $300 |
| 24 Jun 2025 | Stakeholder event & guest speaker | Roads Australia | $300 |
| 2 Sep 2024 | ACE Awards Ticket | Commute Transportation Consultants | $270 |
| 2 Sep 2024 | ACE Awards Ticket | Commute Transportation Consultants | $270 |
| 3 Jul 2024 | Invited speaker at Northland event. Accommodation and Dinner Provided | Northland Inc and The Duke of Marlborough Hotel | $220 |
| 7 Apr 2025 | Safeguard Health and Safety | SafeGuard | $220 |
| 22 Sep 2022 | Invite to CCNZ awards | Downer | $200 |
| 22 Oct 2024 | Civil Contractors NZ (CCNZ) Awards and Dinner | Fulton Hogan / HEB | $200 |
| 4 Oct 2022 | Dinner at IPWEA awards | WSP | $200 |
| 14 Jun 2023 | Framed Print | One NZ | $200 |
| 24 Jun 2025 | Taonga | Ngāti Paoa | $200 |
| 8 May 2023 | Framed Print | One NZ | $200 |
| 28 Mar 2025 | Engineering NZ Fellowship Dinner | Engineering New Zealand Te Ao Rangahau | $200 |
| 28 Mar 2025 | Engineering NZ Fellowship Dinner | Engineering New Zealand Te Ao Rangahau | $200 |
| 25 Mar 2023 | 2 Tickets to Crusaders/Brumbies rugby game | Research First | $200 |
| 28 Mar 2025 | Engineering NZ Fellowship Dinner | Engineering New Zealand Te Ao Rangahau | $200 |
| 23 Feb 2023 | NZ Concrete awards dinner | BBR Contech | $200 |
| 16 Nov 2022 | Complimentary ticket to Open Data Initiative Annual Conference (UK - Virtual) | ODI UK (Non-Profit Organisation) | $200 |
| 18 Dec 2022 | Reusable coffee mugs x 20 | Tonkin & Taylor | $200 |
| 13 Sep 2024 | Attendance at Civil Contractors NZ (CCNZ) Canterbury Westland Contractor of the Year Awards as team nominated | Fulton Hogan | $175 |
| 18 Jun 2024 | Food gift | INSIDE Recruitment | $161 |
| 11 Dec 2023 | Gift basket | Fulton Hogan | $150 |
| 24 Dec 2022 | Gift Box | Cool Tranz Ltd | $150–$190 |
| 27 Feb 2025 | ServiceNow Put AI to Work Summit | Deloitte | $150 |
| 9 Jun 2023 | Client Panel Gift | Ventia | $150 |
| 14 Dec 2023 | Gift basket | Axell | $150 |
| 9 Apr 2025 | National Awards Gala Dinner Meals | Australia ITS Conference | $150 |
| 9 Apr 2025 | Meals | Australia ITS Conference | $150 |
| 13 Dec 2023 | Food gift | Fulton Hogan | $150 |
| 15 Jan 2024 | Downer backpack, drink bottle ear buds | Downer Gisborne for my efforts during Cyclone Gabrielle and Hale | $150 |
| 18 Jun 2024 | Invite to a function | Andre Bankier Perry | $135 |
| 11 Nov 2024 | Hamper | KPMG | $130 |
| 23 Jan 2025 | 2025 State of the Nation Address Lunch | Aecom | $125 |
| 27 Sep 2022 | Annual BOPE NOC Performance Workshop | Higgins | $120 |
| 27 Sep 2022 | Annual BOPE NOC Performance Workshop | Higgins | $120 |
| 27 Sep 2022 | Annual BOPE NOC Performance Workshop | Higgins | $120 |
| 27 May 2025 | Employment Seminar | Dentons Kensington Swan | $100 |
| 27 May 2025 | Employment Seminar | Dentons Kensington Swan | $100 |
| 18 Dec 2024 | Gift basket (food) | BBO Ltd | $100 |
| 16 Aug 2024 | Guest at Civil Contractors NZ (CCNZ) awards dinner | South Roads | $100 |
| 15 Aug 2024 | Dinner | FAST Enterprises | $100 |
| 22 Nov 2023 | Invite to a function | GHD Consultants | $100 |
| 15 Aug 2024 | Dinner | MATTR (Austroads Summit) | $100 |
| 29 Nov 2023 | Invite to a function | QBE | $100 |
| 29 Nov 2023 | Invite to a function | QBE | $100 |
| 2 Oct 2024 | Catering at the Austroads Summit – Apple briefing which included Q&A and a catered event. | Apple | $100 |
| 2 Oct 2024 | Catering at the Austroads Summit – Apple briefing which included Q&A and a catered event. | Apple | $100 |
| 21 Oct 2024 | Dinner | SMX | $100 |
| 5 Dec 2023 | Food gift | H2R consulting | $100 |
| 2 Feb 2024 | Phone holder and a variety of snacks | Vanguard | $100 |
| 28 Mar 2025 | Dinner | Engineering New Zealand Te Ao Rangahau | $100 |
| 24 Jan 2024 | Food gift | The Datastack | $100 |
| 9 Dec 2022 | Gift box | Hurunui Destination Management Group | $100–$120 |
| 15 Aug 2024 | Hospitality | Apple (Austroads Summit) | $100 |
| 18 Dec 2024 | Gift basket (food) | Ghella Limited | $100 |
| 18 Dec 2024 | Gift basket (food) | Unknown | $100 |
| 5 Dec 2024 | Food | H2R Recruitment | $100 |
| 20 Dec 2023 | Downer-branded gear bag containing drink bottle and ear buds | Downer | $100 |
| 20 Nov 2024 | Lunch | Trans - Tasman Business Circle | $80 |
| 21 Dec 2023 | Food gift | Downer | $80 |
| 21 Dec 2023 | Bag, Water Bottle, Snacks, Blanket | Downer - Craig West | $80 |
| 11 Feb 2025 | Dinner | Beca | $80 |
| 9 Apr 2025 | Dinner with SICE | SICE | $80 |
| 30 May 2025 | The T-Tech Conference Dinner | SICE | $80 |
| 19 Feb 2025 | Dinner | Beca | $75 |
| 23 Feb 2024 | Invite to a function | Beca | $75 |
| 23 Feb 2024 | Invite to a function | Beca | $75 |
| 20 Dec 2023 | Food gift | Downer | $70 |
| 9 Apr 2025 | Lunch | Kapsch | $70 |
| 5 Dec 2023 | Food gift | NZ Geo-analytics | $70 |
| 8 Mar 2024 | Gift voucher and an umbrella won through a competition organised by Beca | Beca | $65 |
| 14 Dec 2023 | Invite to a function | Axell | $60 |
| 18 Dec 2023 | Gift basket | Fulton Hogan | $60 |
| 6 Dec 2023 | Food gift | Fulton Hogan | $60 |
| 14 Mar 2024 | Invite to a function | Downer-Southern Link (NOC) | $60 |
| 29 Apr 2025 | Gift Box | Diversity Works | $60 |
| 25 Jun 2024 | Invite to a function | T Tech | $60 |
| 13 May 2024 | Invite to a function | Arupp NZ and Ireland | $60 |
| 5 Jun 2024 | Invite to a function | Verra Mobility | $60 |
| 26 Sep 2024 | Spirit of Service Awards | Public Service Commission | $50 |
| 12 Dec 2023 | Invite to a function | Downer ITS | $50 |
| 4 Dec 2023 | Food gift | Fulton Hogan | $50 |
| 24 Sep 2024 | Employment Seminar | Dentons Kensington Swan | $50 |
| 29 Nov 2023 | Food gift | Big Save limited | $50 |
| 26 Oct 2023 | Invite to a function | WSP | $50 |
| 14 Jun 2025 | Alliance leadership team social event | Private individual | $50 |
| 20 Dec 2024 | Gift (food cup and saucer) | John Webb -maintenance contractor | $50 |
| 10 Jun 2025 | Gift basket | Pavements Conference | $50 |
| 4 Jun 2025 | Client Event - networking | Beca | $50 |
| 21 Oct 2024 | Dinner | Aurecon | $50 |
| 15 May 2025 | Ticket for CyberGov Summit | Gov Tech Aotearoa | $50 |
| 14 May 2025 | Employment Seminar | Minter Ellison Rudd Watts | $50 |
| 2 May 2025 | Lunch | AMIVTAC | $50 |
| 10 Apr 2024 | Food gift | Inspire Group | $50 |
| 19 Mar 2024 | Invite to a function | Aurecon | $50 |
| 6 Dec 2023 | Food gift | Commute Consultants | $50 |
| 19 Mar 2025 | Employment Seminar | Lane Neave Lawyers | $50 |
| 3 Mar 2025 | Lunch | Marsh Insurance | $50 |
| 3 Mar 2025 | Lunch | Marsh Insurance | $50 |
| 3 Mar 2025 | Lunch | Marsh Insurance | $50 |
| 11 Dec 2023 | Gift basket | Fulton Hogan | $50 |
| 14 Nov 2024 | Dinner | Local Government New Zealand | $50 |
| 9 Dec 2024 | Shared breakfast | Downer Group | $50 |
| 4 Dec 2023 | Food gift | Commute | $50 |
About these numbers
What it does, the sentence under the agency's name, was written for this site; the spending lines and their descriptions are Parliament's. The six questions and what's unusual are worked out by fixed rules from the figures on this page, the same for every agency; they report figures and don't rate the agency. Outcomes come from the data on the site's topic pages; the agency is one influence on them among many. Standards and forecasts are from the Estimates of Appropriations and the agency's annual report: they are the agency's own standards. Capital and running costs are Treasury's appropriations data.
Staff, pay and contractors are from the Public Service Commission's workforce data, which measures every department the same way. For crown entitys it publishes staff numbers only, so the contractor figure is the agency's own total to Parliament. For the NZ Transport Agency Waka Kotahi, PSC's figure, the total it gave Parliament and the sum of the engagements it listed agree within 44%.
Contracts, procurement, gifts, consultants, redundancies and perks are copied from the agency's written answers to its select committee, and every figure was checked against the page it came from.
Sources: Public Service Commission Te Kawa Mataaho, Workforce Data and OIA statistics; Office of the Ombudsman; Treasury, Estimates of Appropriations; NZ Transport Agency, Crash Analysis System; NZ Transport Agency Waka Kotahi, responses to annual review questions (2022/23, 2023/24, 2024/25), New Zealand Parliament.